(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

BEABLE

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: US

Quick snapshot

BEABLE

ST13

US500000079422225

Class

37, 39, 42

Filing

79422225

Registration

8164103

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

Attention: there is active risk

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

26

Latest update

06/11/2026

Classification

Registered

Trademark type

Word

Nice classes

37, 39, 42

Filing date

12/27/2024

Registration date

03/10/2026

Expiration date

-

Recommended action

Perform a full collision analysis and validate classes before any filing or trademark investment.

Next step

These are the details of the registration process. Even so, constant monitoring is what ensures peace of mind that your main asset remains protected.

Complete case details

Structured fields from the responsible authority and the official record.

Status date

03/10/2026

Last transaction

06/11/2026

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

4

Owner type

03

Owner location

JP

Examiner

BROWN, TINA

Law office

M90

Current location

FILE REPOSITORY (FRANCONIA)

Holders and representatives

Holders

beABLE CO., LTD.

Representatives

Eunyoung Lee Monami Law Group PLLC

Technical classification

Nice Classes

Class 37Class 39Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 37

Construction of nuclear power plants; construction consulting on decommissioning methods for nuclear power plants; construction of thermal power plants; repair and maintenance of power generation equipment; power plant constructionassemblyinstallationrepairmaintenancedemolition; general building construction worksbuilding construction and building construction supervision related to power plantsenvironmental sanitation facilitieswaste treatment plantswaste recycling plants

Class 39

Electricity distribution; distribution of energy; supply of electricity to users in commercial areasdistribution and transmission of electricity; supply of renewable energydistribution of renewable energy and electric power wheeling in the nature of transmission of electricity; consulting on energy supplyconsulting on the distribution of energy and optimization of energy in the nature of distribution and transmission of electricity

Class 42

Design of power plants; architecture servicesarchitectural design and architectural consultancy; providing consulting and information regarding building design; architectural and engineering services; geological surveys and research; consulting on geological surveys; surveying on the field of architecture; architectural servicespreparation of architectural investigation reports; architectural surveying; computer system development; technical advice for digital transformationtechnological consulting services for digital transformation and technological consultation in the field of artificial intelligence; surveying terrain using drones; environmental hygiene inspection services for buildings; radiation measurement servicesmeasuring radiation dose; environmental sanitation system engineering; robotics engineering

Publications

History of USPTO decisions and trademark events.

26 publications found

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

06/10/2026

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

03/10/2026

R.PR

REGISTERED-PRINCIPAL REGISTER

03/10/2026

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

01/20/2026

PUBO

PUBLISHED FOR OPPOSITION

01/20/2026

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

01/14/2026

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

12/21/2025

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

12/15/2025

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

12/15/2025

ERFR

TEAS REQUEST FOR RECONSIDERATION RECEIVED

12/15/2025

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

12/08/2025

GNFR

FINAL REFUSAL E-MAILED

12/08/2025

CNFR

FINAL REFUSAL WRITTEN

12/08/2025

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

12/08/2025

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

12/08/2025

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

12/08/2025

RFNT

REFUSAL PROCESSED BY IB

08/30/2025

NREP

NEW REPRESENTATIVE AT IB RECEIVED

08/21/2025

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

08/04/2025

RFRR

REFUSAL PROCESSED BY MPU

08/04/2025

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

06/13/2025

CNRT

NON-FINAL ACTION WRITTEN

06/12/2025

DOCK

ASSIGNED TO EXAMINER

06/10/2025

MAFR

APPLICATION FILING RECEIPT MAILED

04/28/2025

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

04/28/2025

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

04/24/2025

Continuous trademark protection

Get notified about every new filing that threatens BEABLE or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.