(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

WIRE THE FUTURE

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

WIRE THE FUTURE

ST13

US500000099283803

Class

37, 42

Filing

99283803

Registration

8069554

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

10

Latest update

12/17/2025

Trademark type

Word

Nice classes

37, 42

Filing date

07/15/2025

Registration date

12/16/2025

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

12/16/2025

Last transaction

12/17/2025

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

First use anywhere

05/12/2025

First use in commerce

05/12/2025

Drawing code

4

Owner type

03

Owner location

Fargo, ND

Examiner

LEE,RAYMOND KANGMIN

Law office

N90

Current location

FILE REPOSITORY (FRANCONIA)

Holders and representatives

Holders

Ulteig Engineers, Inc.

Representatives

Kelly L. Williams Quarles & Brady LLP

Technical classification

Nice Classes

Class 37Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 37

Construction of transmission power line infrastructures including erecting power towerspower polessubstations; construction planning; construction management; all in the power and energy field.

Class 42

Civil infrastructure design services; Civil infrastructure engineering services; Engineering servicesengineering for the integrating of wind and solar energy generation sources into existing power grids and infrastructures for the transmission of energy and powerfor adjusting to heavy energy load demands on power grids and infrastructures caused by data centers and other heavy energy load demand users; Engineering servicesengineering for the building and installing of new transmission line infrastructures and integration into existing power grids; all in the power and energy field

Publications

History of USPTO decisions and trademark events.

10 publications found

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

12/16/2025

R.PR

REGISTERED-PRINCIPAL REGISTER

12/16/2025

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

10/28/2025

PUBO

PUBLISHED FOR OPPOSITION

10/28/2025

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

10/22/2025

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

09/25/2025

DOCK

ASSIGNED TO EXAMINER

09/24/2025

MAFR

APPLICATION FILING RECEIPT MAILED

07/15/2025

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

07/15/2025

NWAP

NEW APPLICATION ENTERED

07/15/2025

Continuous trademark protection

Get notified about every new filing that threatens WIRE THE FUTURE or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.