(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

BLUE RIDGE POWER

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

BLUE RIDGE POWER

ST13

US500000097891567

Class

35, 37, 42

Filing

97891567

Registration

7561175

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

25

Latest update

11/05/2024

Trademark type

Word

Nice classes

35, 37, 42

Filing date

04/17/2023

Registration date

11/05/2024

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

11/05/2024

Last transaction

11/05/2024

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Supplemental Register

First use anywhere

05/17/2021

First use in commerce

05/17/2021

Drawing code

4

Owner type

16

Owner location

Asheville, NC

Examiner

BARREDA, AMBER

Current location

FILE REPOSITORY (FRANCONIA)

Holders and representatives

Holders

Blue Ridge Power, LLC

Representatives

Jacob W Neu BRADLEY ARANT BOULT CUMMINGS, LLP

Technical classification

Nice Classes

Class 35Class 37Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 35

Procurement servicespurchasing of solar energy equipmentmodulestransformersinverterstracker systemsrackingpilescables for others for solar energy infrastructure; Procurement servicespurchasing of battery energy equipmentbattery cellscontainersenclosuresinverterstransformersbattery management systemsenergy management systems for others for renewable energy infrastructure; Procurement servicespurchasing of clean energy equipmentsolar photovoltaic modulesmedium-voltage transformersmain power transformerspower conversion systemsinverters for others for clean energy infrastructure; Procurement servicespurchasing of utility-scale energy infrastructure equipmenthigh-voltage transformerscircuit breakersrelay panelsdisconnect switchesarrestorspole mounted transformersvoltage potential transformersCCVTs for others for utility-scale energy infrastructure in the fields of solar energyrenewable energyclean energy

Class 37

Construction consultancy; Construction planning; Construction of solar energy infrastructure systems; Construction of renewable energy infrastructure systems; Construction of clean energy infrastructure systems; Construction of utility-scale energy infrastructure systems in the fields of solar energyrenewable energyclean energy; Construction project management services in the field of solar energy systems; Construction project management services in the field of renewable energy systems; Construction project management services in the field of clean energy systems; Construction project management services in the field of utility-scale energy systems for solar energyrenewable energyclean energy; Installation of solar energy generation equipment; Installation of renewable energy generation equipment; Installation of clean energy generation equipment; Installation of utility-scale energy generation equipment in the fields of solar energyrenewable energyclean energy; Installation of solar energy infrastructure systems; Installation of renewable energy infrastructure systems; Installation of clean energy infrastructure systems; Installation of utility-scale energy infrastructure systems in the fields of solar energyrenewable energyclean energy

Class 42

Engineering; Engineering design services; Engineering services in the field of solar energy; Engineering services in the field of renewable energy; Engineering services in the field of clean energy; Engineering services for utility-scale energy infrastructure systems in the fields of solar energyrenewable energyclean energy; Designplanningengineering of solar energy systems; Designplanningengineering of renewable energy systems; Designplanningengineering of clean energy systems; Designplanningengineering of utility-scale energy systems in the fields of solar energyrenewable energyclean energy; Technology planning and consultation services in the field of solar energy; Technology planning and consultation services in the field of renewable energy; Technology planning and consultation services in the field of clean energy; Technology planning and consultation services for utility-scale energy systems in the fields of solar energyrenewable energyclean energy; Technical consultation in the field of production of solar energy; Technical consultation in the field of production of renewable energy; Technical consultation in the field of production of clean energy; Technical consultation for production of energy from utility-scale energy systems in the fields of solar energyrenewable energyclean energy

Publications

History of USPTO decisions and trademark events.

25 publications found

NRCS

NOTICE OF REGISTRATION CONFIRMATION EMAILED

11/05/2024

R.SR

REGISTERED-SUPPLEMENTAL REGISTER

11/05/2024

CNTA

APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER

09/25/2024

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

08/22/2024

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

08/22/2024

ERFR

TEAS REQUEST FOR RECONSIDERATION RECEIVED

08/22/2024

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

08/21/2024

GNFR

FINAL REFUSAL E-MAILED

08/21/2024

CNFR

FINAL REFUSAL WRITTEN

08/21/2024

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

07/12/2024

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

07/11/2024

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

07/11/2024

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

04/16/2024

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

04/16/2024

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

04/16/2024

CHAN

APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED

04/16/2024

COAR

TEAS CHANGE OF OWNER ADDRESS RECEIVED

04/16/2024

XELG

APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED

04/12/2024

XELR

APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED

04/12/2024

GNRN

NOTIFICATION OF NON-FINAL ACTION E-MAILED

01/12/2024

GNRT

NON-FINAL ACTION E-MAILED

01/12/2024

CNRT

NON-FINAL ACTION WRITTEN

01/12/2024

DOCK

ASSIGNED TO EXAMINER

01/12/2024

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

05/10/2023

NWAP

NEW APPLICATION ENTERED

04/20/2023

Continuous trademark protection

Get notified about every new filing that threatens BLUE RIDGE POWER or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.