(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

CGA

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

CGA

ST13

US500000097307103

Class

37, 42, 44

Filing

97307103

Registration

7198940

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

21

Latest update

10/24/2023

Trademark type

Combined

Nice classes

37, 42, 44

Filing date

03/11/2022

Registration date

10/24/2023

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

10/24/2023

Last transaction

10/24/2023

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

First use anywhere

01/01/1998

First use in commerce

01/01/1998

Drawing code

5

Owner type

16

Owner location

Loveland, CO

Examiner

AURAND, MEGAN

Law office

O10

Current location

PUBLICATION AND ISSUE SECTION

Mark description

The mark consists of the stylized letters "CGA" all in caps, where "C" is on top of "G" and "A" is centered to the right of "C" and "G"; all the foregoing appears on a shaded square with rounded corners.

Holders and representatives

Holders

Safebuilt, LLC

Representatives

Peter A. Chiabotti AKERMAN LLP

Technical classification

Nice Classes

Class 37Class 42Class 44

Vienna Codes

No Vienna codes available.

Goods and services

Class 37

Construction engineering inspection (CEI) servicesconstruction inspection services in the course of roadway and bridge construction; construction observation in the nature of inspection services in the course of construction of infrastructure installation to verify that the infrastructure is installed; Building inspection in the course of building construction

Class 42

Engineeringcivil engineeringconstruction engineeringmunicipal servicesengineering services for the construction of water treatment plants and other municipal infrastructure facilitiestransportation planning and traffic engineeringsurveying and mappingplanning of buildings and infrastructure systems for buildingsenvironmental planning servicesdesign of specialty exterior environmental settingsenvironmental site designdevelopment of environmental design guidelines; urban design planningurban design planning services; urban redevelopment design planningurban design planning services in declining neighborhoods; technical indoor air quality monitoring services; data technologies servicesproviding a website featuring on-line non-downloadable software that enables users to share datawebsite development for otherscustom computer software design and development; andconsultation services in connection with all of the foregoing; evaluation in the course of infrastructure construction installation to certify that the infrastructure is installed in compliance with the architectural and engineering designs therefor; evaluation of construction to assure compliance with building codes and regulations

Class 44

Landscape architecture; Landscape design

Publications

History of USPTO decisions and trademark events.

21 publications found

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

10/24/2023

R.PR

REGISTERED-PRINCIPAL REGISTER

10/24/2023

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

08/08/2023

PUBO

PUBLISHED FOR OPPOSITION

08/08/2023

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

07/19/2023

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

07/03/2023

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

06/15/2023

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

06/14/2023

ERFR

TEAS REQUEST FOR RECONSIDERATION RECEIVED

06/14/2023

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

04/10/2023

GNFR

FINAL REFUSAL E-MAILED

04/10/2023

CNFR

FINAL REFUSAL WRITTEN

04/10/2023

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

03/01/2023

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

03/01/2023

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

03/01/2023

GNRN

NOTIFICATION OF NON-FINAL ACTION E-MAILED

12/29/2022

GNRT

NON-FINAL ACTION E-MAILED

12/29/2022

CNRT

NON-FINAL ACTION WRITTEN

12/29/2022

DOCK

ASSIGNED TO EXAMINER

12/22/2022

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

03/16/2022

NWAP

NEW APPLICATION ENTERED

03/15/2022

Continuous trademark protection

Get notified about every new filing that threatens CGA or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.