(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

V VERTIV

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

V VERTIV

ST13

US500000086972788

Class

6, 9, 11, 37, 40, 41, 42

Filing

86972788

Registration

6746942

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

87

Latest update

09/04/2025

Trademark type

Combined

Nice classes

6, 9, 11, 37, 40, 41, 42

Filing date

04/12/2016

Registration date

05/31/2022

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

05/31/2022

Last transaction

09/04/2025

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Filing basis

Intent to use

First use anywhere

11/14/2017

First use in commerce

11/14/2017

Drawing code

3

Owner type

03

Owner location

COLUMBUS, OH

Examiner

RINKER, ANTHONY

Law office

L20

Current location

PUBLICATION AND ISSUE SECTION

Mark description

The mark consists of a solid circle surrounding a cutout of a stylized letter "V" and a pyramid cutout at the bottom adjacent to the stylized text "VERTIV".

Holders and representatives

Holders

VERTIV GROUP CORPORATION
Vertiv Co.

Representatives

Lisa M. DuRoss HARNESS, DICKEY & PIERCE, P.L.C.

Technical classification

Nice Classes

Class 6Class 9Class 11Class 37Class 40Class 41Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 6

metal panel systems comprising metal wallsceilingfloor and door panels and metal mounting accessories thereforfor use in controlling the flow of cooling air in data centers and computer rooms; brackets

Class 9

electric control panels for monitoring electrical and battery back-up power system critical system alarms; automatic transfer switches; battery backup power systems; computer hardware and peripherals for remote access and control of computers; computer hardware and software for data center infrastructure configuration and management; data center and computer room infrastructure management systems comprised primarily of uninterruptible power supplieselectronic controller for controlling air conditioning and temperatureair flow sensorssoftware for monitoring data center and computer room infrastructure equipmentalso containing a cooling system comprised primarily of air cooling apparatuscooling evaporatorsair conditioning unitselectric fanswater cooling towers and associated electronic fan controlsair conditioning controls and power controllerscabinets specially adapted for computer hardware equipmentrackscurtainsdoors and containment panels for use with computer systemsall sold together as a unit; data center monitoring and control systemsmicroprocessor based hardware and software used to monitor and control electrical and electronic equipmentclimate conditions in a data centertelecommunication centercomputer room or electronic equipment room environment; electric control switches; electric power converters; electric power monitoring and control systemsmicroprocessor based hardware and software used to monitor the status and control electrical power systemspower transfer switcheselectric power load bankselectric power distribution unitsbattery systems and uninterruptible electrical power supply systems; electrical power distribution units; electrical power load bankselectrical power distribution units; electrical power transfer switches; electronic controls for server racks and data center cooling units; enclosurescabinets and racks for computer servers and electrical and electronic equipment; electronic thermostat regulating devices for control of heat; climate control and cooling systems for telecom and data communication equipmentconsisting of thermostats for cooling equipment and a programmable logic controller (PLC); microprocessor based hardware and software used to monitor and control cooling and air handler units for data centers and other computer and telecommunications equipment applications; power line conditioners; electric power converters; electrical power distribution units; power dividerselectric switches; power supplies; power switches; rectifiers; regulating apparatus for electric power; electric regulating apparatus for the operation of power systems; regulators for phase shifting of communication signal regulators for phase shifting of electronic signals; remote electrical power control switches; remote controllers for power supplies; server rack monitoring systemsmicroprocessor based hardware and software used to monitor the status of electronic and electrical equipment in a server rack; computer server racks; computer server racks incorporating integrated cooling units; electric luminescent display panels; software for data center infrastructure configuration and management; automatic transfer switches (ATS); uninterruptible electrical power supplies; voltage regulators; voltage surge protectors; voltage surge suppressors

Class 11

air handlers for cooling data centers; cooling units and systems comprised of cooling units and air conditioners for computer server racks and computer data centers; cooling units for computers and computer rooms; air conditioning condensers for use in cooling data centerscomputer rooms and other computer and electronic equipment applications

Class 37

installationmaintenance and repair of data center cooling systems; installationmaintenance and repair of power generatingcomputer and telecommunications equipment; installationmaintenance and repair of computer room air conditioning (CRAC) systems; installationrepair and maintenance of batteries; installationrepair and maintenance of electrical power systems; installationrepair and maintenance of batteries and fuel cells for electrical power systems; maintenance and preventive maintenance services of air conditioning for data centers and computer rooms; installation of electrical power systems for computer and telecommunications network applications for others

Class 40

manufacture of electrical power switches and controllers for computer and telecommunications network applications to the order and/or specification of others; manufacture of power solutions for network applications; manufacture of power supplies for computingcommunicationsindustrial equipment applications to order and/or specification of others; custom manufacture of electrical power solutions for network applications; custom manufacture of power supplies for computingcommunicationsindustrial equipment applications; manufacture of electrical power solutions for network applications for others; manufacture of power supplies for computingcommunicationsindustrial equipment applications for others

Class 41

educational servicesconducting classesseminarsworkshops in the field of electrical power systemsdata center infrastructure managementdistribution of training material in connection therewith

Class 42

air conditioning maintenance assessment services for the performance and reliability of air conditioning systems for data centers and computer rooms; battery monitoring and testing; consulting services in the field of design and engineering of electrical and battery back-up power systems for data centerscomputer rooms and other commercial and industrial facilities; design of electrical and battery back-up power systems for computer and telecommunications network applications for others; engineering servicestechnical project planning and design engineering for others in the fields of electrical and battery back-up power systemscomputer networks and telecommunications projects; electrical engineering servicesproviding technical analysistestingstudiesrecommendations and drafting plans relating to the safetyefficiencyperformance and reliability of electrical equipment and power systems; electrical and battery back-up power systems and data center computer and telecommunications equipment engineering services; engineering servicesproviding technical assessment of the performancereliabilitymaintenance and configuration of data center and commercial and industrial facility electrical and battery back-up power systems; engineering servicesproviding technical assessment of the performancereliabilitymaintenance and configuration of data center cooling systems; remote monitoring of the functioning and use of data center and computer room electrical equipmentelectrical and battery back-up power systemsdata center and computer room heatingventilating and air conditioning apparatus; technical consultation in the fields of engineering of electrical and battery back-up power systems

Publications

History of USPTO decisions and trademark events.

87 publications found

ASCK

ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY

09/03/2025

ASCK

ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY

01/24/2024

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

05/31/2022

R.PR

REGISTERED-PRINCIPAL REGISTER

05/31/2022

SUNA

NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED

04/27/2022

CNPR

ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED

04/26/2022

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

03/28/2022

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

03/28/2022

CHAN

APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED

03/28/2022

ALIE

ASSIGNED TO LIE

03/24/2022

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

03/22/2022

GNRN

NOTIFICATION OF NON-FINAL ACTION E-MAILED

09/24/2021

GNRT

NON-FINAL ACTION E-MAILED

09/24/2021

CNRT

SU - NON-FINAL ACTION - WRITTEN

09/24/2021

SUPC

STATEMENT OF USE PROCESSING COMPLETE

08/23/2021

IUAF

USE AMENDMENT FILED

08/20/2021

EISU

TEAS STATEMENT OF USE RECEIVED

08/20/2021

EXRA

NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED

02/09/2021

EX5G

SOU EXTENSION 5 GRANTED

02/08/2021

AITU

CASE ASSIGNED TO INTENT TO USE PARALEGAL

02/08/2021

EXT5

SOU EXTENSION 5 FILED

01/22/2021

EEXT

SOU TEAS EXTENSION RECEIVED

01/22/2021

EXRA

NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED

08/19/2020

EX4G

SOU EXTENSION 4 GRANTED

08/17/2020

EXT4

SOU EXTENSION 4 FILED

08/17/2020

EEXT

SOU TEAS EXTENSION RECEIVED

08/17/2020

EXRA

NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED

02/29/2020

EX3G

SOU EXTENSION 3 GRANTED

02/20/2020

EXT3

SOU EXTENSION 3 FILED

02/20/2020

EEXT

SOU TEAS EXTENSION RECEIVED

02/20/2020

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

02/19/2020

CHAN

APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED

02/19/2020

EWAF

TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS

02/19/2020

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

02/19/2020

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

02/19/2020

COAR

TEAS CHANGE OF OWNER ADDRESS RECEIVED

02/19/2020

EXRA

NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED

08/23/2019

EX2G

SOU EXTENSION 2 GRANTED

08/21/2019

EXT2

SOU EXTENSION 2 FILED

08/21/2019

EEXT

SOU TEAS EXTENSION RECEIVED

08/21/2019

ASCK

ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY

06/12/2019

EXRA

NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED

02/21/2019

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

02/19/2019

EX1G

SOU EXTENSION 1 GRANTED

02/19/2019

EXT1

SOU EXTENSION 1 FILED

02/19/2019

EEXT

SOU TEAS EXTENSION RECEIVED

02/19/2019

NOAM

NOA E-MAILED - SOU REQUIRED FROM APPLICANT

08/21/2018

ETOP

EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED

07/11/2018

ETOF

EXTENSION OF TIME TO OPPOSE RECEIVED

05/15/2018

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

05/01/2018

PUBO

PUBLISHED FOR OPPOSITION

05/01/2018

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

04/11/2018

PREV

LAW OFFICE PUBLICATION REVIEW COMPLETED

03/23/2018

ALIE

ASSIGNED TO LIE

03/16/2018

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

03/09/2018

XAEC

EXAMINER'S AMENDMENT ENTERED

03/09/2018

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

03/09/2018

GNEA

EXAMINERS AMENDMENT E-MAILED

03/09/2018

CNEA

EXAMINERS AMENDMENT -WRITTEN

03/09/2018

ZZZX

PREVIOUS ALLOWANCE COUNT WITHDRAWN

03/09/2018

IUCN

NOTICE OF ALLOWANCE CANCELLED

03/08/2018

NOAM

NOA E-MAILED - SOU REQUIRED FROM APPLICANT

12/05/2017

ASGN

AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP

11/22/2017

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

10/10/2017

PUBO

PUBLISHED FOR OPPOSITION

10/10/2017

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

09/20/2017

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

08/28/2017

XAEC

EXAMINER'S AMENDMENT ENTERED

08/28/2017

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

08/28/2017

GNEA

EXAMINERS AMENDMENT E-MAILED

08/28/2017

CNEA

EXAMINERS AMENDMENT -WRITTEN

08/28/2017

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

08/04/2017

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

08/03/2017

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

08/03/2017

GNRN

NOTIFICATION OF NON-FINAL ACTION E-MAILED

02/03/2017

GNRT

NON-FINAL ACTION E-MAILED

02/03/2017

CNRT

NON-FINAL ACTION WRITTEN

02/03/2017

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

01/14/2017

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

01/13/2017

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

01/13/2017

GNRN

NOTIFICATION OF NON-FINAL ACTION E-MAILED

07/19/2016

GNRT

NON-FINAL ACTION E-MAILED

07/19/2016

CNRT

NON-FINAL ACTION WRITTEN

07/19/2016

DOCK

ASSIGNED TO EXAMINER

07/18/2016

MDSC

NOTICE OF DESIGN SEARCH CODE E-MAILED

04/16/2016

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

04/15/2016

NWAP

NEW APPLICATION ENTERED

04/15/2016

Continuous trademark protection

Get notified about every new filing that threatens V VERTIV or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.