(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

X

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

X

ST13

US500000079420428

Class

7, 9

Filing

79420428

Registration

8081847

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

23

Latest update

07/30/2026

Trademark type

Combined

Nice classes

7, 9

Filing date

02/21/2025

Registration date

12/30/2025

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

12/30/2025

Last transaction

07/30/2026

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

3

Owner type

16

Owner location

AU

Examiner

CRUZADO, SAMANTHA LEE

Law office

O10

Current location

FILE REPOSITORY (FRANCONIA)

Mark description

White upper case stylised "X" on a dark blue circular background

Holders and representatives

Holders

Makinex IP Pty Ltd

Representatives

Angel Miguel Munoz, Esq. Munoz-Lopez & Associates PLLC

Technical classification

Nice Classes

Class 7Class 9

Vienna Codes

No Vienna codes available.

Goods and services

Class 7

Electric power generators for emergency use; portable electric power generators; generators of electricity; electricity generators; electric power generators; mobile generators of electricity; electricity generators used with solar collectors; Electric power-generating engines and their structural parts

Class 9

Solar panel installations for generating electricity; photovoltaic apparatus and installations for generating solar electricityphotovoltaic cells; portable solar panels for the production of electricity; solar batteries for industrial use; solar photovoltaic power plant apparatusphotovoltaic solar panels for the production electricity; control equipment for power plantsapparatus and instruments for conductingswitchingtransformingconditioninginvertingconvertingaccumulatingregulatingcontrolling the distribution or use of electricity; photovoltaic power plant apparatusphotovoltaic solar panels for the production of electricity; photovoltaic-based power plant apparatusphotovoltaic solar panels for the production of electricity; power units in the nature of batteries; power inverters; electric power supply unitsother than electricity generators; electric power supplies other than generators; power modules in the nature of batterieselectrical power supplies; power generation monitoring apparatuselectronic monitor modules for monitoring electric current and electrical signals

Publications

History of USPTO decisions and trademark events.

23 publications found

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

07/30/2026

FICS

FINAL DISPOSITION NOTICE SENT TO IB

07/13/2026

FIMP

FINAL DISPOSITION PROCESSED

07/13/2026

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

03/30/2026

NREP

NEW REPRESENTATIVE AT IB RECEIVED

03/05/2026

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

12/30/2025

R.PR

REGISTERED-PRINCIPAL REGISTER

12/30/2025

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

11/11/2025

PUBO

PUBLISHED FOR OPPOSITION

11/11/2025

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

11/05/2025

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

10/15/2025

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

10/14/2025

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

10/09/2025

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

10/09/2025

RFNT

REFUSAL PROCESSED BY IB

09/19/2025

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

09/03/2025

RFRR

REFUSAL PROCESSED BY MPU

09/03/2025

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

07/30/2025

CNRT

NON-FINAL ACTION WRITTEN

07/29/2025

DOCK

ASSIGNED TO EXAMINER

07/28/2025

MAFR

APPLICATION FILING RECEIPT MAILED

04/04/2025

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

04/04/2025

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

04/03/2025

Continuous trademark protection

Get notified about every new filing that threatens X or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.