(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

NEARGRID

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

NEARGRID

ST13

US500000079419730

Class

9

Filing

79419730

Registration

8278874

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

31

Latest update

08/19/2026

Trademark type

Word

Nice classes

9

Filing date

01/14/2025

Registration date

06/02/2026

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

06/02/2026

Last transaction

08/19/2026

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

4

Owner type

99

Owner location

BE

Examiner

CORNWELL, ANDREA B

Law office

M60

Current location

FILE REPOSITORY (FRANCONIA)

Holders and representatives

Holders

Near grid Solutions BV

Representatives

Clifford D. Hyra Fresh IP PLC

Technical classification

Nice Classes

Class 9

Vienna Codes

No Vienna codes available.

Goods and services

Class 9

Apparatus and instruments for conductingconvertingswitchingaccumulatingregulating or controlling of the distribution or use of electric current and voltage; battery packs; batteries; lithium ion batteries; batterieselectric; stationary battery systems comprised of batteries and battery chargersbattery performance monitorselectric power convertersuninterruptible power supply apparatusbatteriesrenewable battery system to provide primary and backup powermonitoring devices for monitoring battery performance characteristicsauxiliary battery packs; battery systems with rechargeable batteries comprised of batteries and battery chargersbattery performance monitorselectric power convertersgrid-interactive and grid-stabilizing power supply apparatusbatteriessupercapacitors and ultracapacitors for energy storage; uninterruptible power supply apparatusbatteriesrenewable battery system to provide primary and backup powermonitoring devices for monitoring battery performance characteristicsauxiliary battery packs; battery adapters in the nature of power adaptersplug adapters; batterieselectricfor vehicles; battery chargers and battery discharge cables; battery terminal connector clamps and battery terminals; battery cables and boxes; battery jars; batteries for electric vehicles; charging stations for electric vehicles; battery measuring and control devicesclamp meters for measuring electricity generated by batteriesan electronic measurement apparatus for use in the measurement of battery health and performance; electricity measuring instrumentsclamp meters for measuring electricity; apparatus and instruments for controlling electricity; electrical monitoring equipmentbattery performance monitorselectronic monitors and monitor modules for monitoring electric current and electrical signals; equipment for measuringmonitoring and analyzing electricity consumptionelectric power metersclamp meters for measuring electricity; electrical control devices for energy management; energy control equipmentelectric control devices for energy management; energy supply management equipmentelectric control devices for energy management; electronic devicesenergy meters for tracking and monitoring energy usage; energy regulators being apparatus and instruments for regulating the distribution or use of electricity; recorded software for monitoringcontrollingconvertingstoringregulating and controlling electricityelectricity consumptioncharging batteries and accumulatorsbattery and accumulator chargers; recorded computer software for use in optimizing battery managementbattery control and energy storage and to enable users to capturerecordmonitordisplaytransmitprocess and analyse information and data relating to energy storage and battery performance; recorded platform software for use in optimizing battery managementbattery control and energy storage and to enable users to capturerecordmonitordisplaytransmitprocess and analyse information and data relating to energy storage and battery performance; recorded computer software for use in remote electricity meter monitoring; recorded computer software for use in remote electricity meter reading; recorded software for remote diagnostics in the field of electricity controllingregulatingmonitoringdistributing and accumulating equipment; electrical charge controllers being electrical controlling devices; current convertors; converterselectric; current-meters in the nature of electronic devices for measuring electric current; power wires; fuses; electricity current limiters; switcheselectric; power distributing boxes; electric power controllers; electric voltage transformers; voltage monitor modules; electric voltage converters; stress gauges

Publications

History of USPTO decisions and trademark events.

31 publications found

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

08/19/2026

OPNR

NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB

08/19/2026

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

06/02/2026

R.PR

REGISTERED-PRINCIPAL REGISTER

06/02/2026

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

04/14/2026

PUBO

PUBLISHED FOR OPPOSITION

04/14/2026

GPNX

NOTIFICATION PROCESSED BY IB

04/09/2026

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

04/08/2026

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

03/25/2026

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

03/25/2026

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

03/16/2026

XAEC

EXAMINER'S AMENDMENT ENTERED

03/16/2026

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

03/16/2026

GNEA

EXAMINERS AMENDMENT E-MAILED

03/16/2026

CNEA

EXAMINERS AMENDMENT -WRITTEN

03/16/2026

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

03/09/2026

GNFR

FINAL REFUSAL E-MAILED

03/09/2026

CNFR

FINAL REFUSAL WRITTEN

03/09/2026

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

02/05/2026

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

02/05/2026

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

02/05/2026

RFNT

REFUSAL PROCESSED BY IB

08/29/2025

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

08/12/2025

RFRR

REFUSAL PROCESSED BY MPU

08/11/2025

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

06/26/2025

CNRT

NON-FINAL ACTION WRITTEN

06/25/2025

DOCK

ASSIGNED TO EXAMINER

06/23/2025

MAFR

APPLICATION FILING RECEIPT MAILED

03/28/2025

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

03/28/2025

LIMI

LIMITATION FROM ORIGINAL APPLICATION ENTERED

03/25/2025

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

03/20/2025

Continuous trademark protection

Get notified about every new filing that threatens NEARGRID or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.