(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

GRUPO ORTIZ COMPROMISO SOSTENIBLE CONSTRUYENDO SOSTENIBILIDAD

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

GRUPO ORTIZ COMPROMISO SOSTENIBLE CONSTRUYENDO SOSTENIBILIDAD

ST13

US500000079410677

Class

9, 37, 39, 42

Filing

79410677

Registration

8299560

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

26

Latest update

06/16/2026

Trademark type

Combined

Nice classes

9, 37, 39, 42

Filing date

09/23/2024

Registration date

06/16/2026

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

06/16/2026

Last transaction

06/16/2026

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

3

Owner type

88

Owner location

ES

Examiner

MOLK, DANA L

Law office

O40

Current location

FILE REPOSITORY (FRANCONIA)

Mark description

The mark consists of the stylized wording "GRUPO ORTIZ". The wording shares the same letter "O" at the end of the wording "GROUPO" and the beginning of the wording "ORITIZ". That letter "O" is comprised of a red circle with a break in the middle vertically. The rest of the lettering in the wording "GROUPO" and "ORTIZ" is in black. Underneath the wording "GRUPO ORTIZ" is the stylized wording "COMPROMISO SOSTENIBLE" in black. Surrounding the wording "GRUPO ORTIZ" and "COMPROMISO SOSTENIBLE" is a red circular border with a break in the middle vertically and black shadowing. Inside the left part of the circular border is the stylized wording "CONSTRUYENDO" in white. Inside the right part of the circular border is the stylized wording "SOSTENIBILIDAD" in white.

Holders and representatives

Holders

ORTIZ CONSTRUCCIONES Y PROYECTOS, S.A.

Representatives

Lisa K. Shebar Tarolli, Sundheim, Covell & Tummino LLP

Technical classification

Nice Classes

Class 9Class 37Class 39Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 9

Downloadable virtual reality training simulation software in the field of construction; downloadable software for planningintegrating and optimizing applications in the field of construction; photovoltaic installations for producing electricityphotovoltaic solar panels for the production of electricity ; downloadable computer software programs for virtual design and construction (VDC) using building information modeling (BIM) in the field of energy management.

Class 37

Construction project management services; custom construction of buildings; prefabricated building construction; construction of sustainable civil engineering structures; building construction supervision and construction management; installation of building automation equipment; sustainable infrastructure constructionbuilding construction for civil infrastructure projects; installation and maintenance services for photovoltaic installations; installationrepair and maintenance services for networks for distribution of gaselectricity and oil; installationrepair and maintenance services for apparatus and devices for controlling energy consumption; services for the constructioninstallationrepair and maintenance of geothermal energy based power plants and buildings and installations therefor; renovation and restoration of buildings; building construction of railway infrastructure.

Class 39

Distribution of energy; renewable energy distribution; providing online information and advisory services in the field of energy distribution; distribution and storage services for gaselectricityfuelscarburantsenergy from renewable sourcesenergy obtained from non-renewable sources; transport and storage services for gaselectricityfuelscarburantsenergy from renewable sourcesenergy obtained from non-renewable sources; services for the distributionsupply and transmission of energy

Class 42

Architectural services; civil infrastructure design services; civil structural engineering services; design and development of virtual reality software; development of computer programs for simulating sustainable virtual buildings; custom design of prototypes; computer project management services in the field of software systems used for architectural projects; architectural services for building design; engineering testingtesting of apparatus in the field of electrical engineering; industrial testing of engineering structures; environmental testing services; environmental testing and inspection servicesmonitoring of environmental conditions and activities affecting the structural environment within civil engineering structures; environmental testing and inspection servicesmonitoring events and human and natural activities that affect environmental conditions within civil engineering structures; technical project planning in the engineering sector; engineering design and computer-aided engineering services for others; analysis of structural behavior of building materials; development of computer programs recorded on data media in the nature of CAD/CAM computer software designed for use in the field of automated construction and manufacturing; computer-aided design services related to building projects; design and development of energy distribution networks; design and development of renewable energy generation systems

Publications

History of USPTO decisions and trademark events.

26 publications found

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

06/16/2026

R.PR

REGISTERED-PRINCIPAL REGISTER

06/16/2026

OPNX

NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB

05/14/2026

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

04/28/2026

PUBO

PUBLISHED FOR OPPOSITION

04/28/2026

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

04/27/2026

OPNR

NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB

04/27/2026

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

04/22/2026

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

04/02/2026

XAEC

EXAMINER'S AMENDMENT ENTERED

04/02/2026

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

04/02/2026

GNEA

EXAMINERS AMENDMENT E-MAILED

04/02/2026

CNEA

EXAMINERS AMENDMENT -WRITTEN

04/02/2026

DOCK

ASSIGNED TO EXAMINER

02/04/2026

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

12/14/2025

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

12/14/2025

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

12/14/2025

RFNT

REFUSAL PROCESSED BY IB

07/05/2025

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

06/13/2025

RFRR

REFUSAL PROCESSED BY MPU

06/13/2025

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

04/10/2025

CNRT

NON-FINAL ACTION WRITTEN

04/09/2025

DOCK

ASSIGNED TO EXAMINER

03/18/2025

MAFR

APPLICATION FILING RECEIPT MAILED

11/29/2024

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

11/29/2024

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

11/28/2024

Continuous trademark protection

Get notified about every new filing that threatens GRUPO ORTIZ COMPROMISO SOSTENIBLE CONSTRUYENDO SOSTENIBILIDAD or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.