(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

HYREX

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

HYREX

ST13

US500000079379469

Class

11, 37, 42

Filing

79379469

Registration

7490833

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

40

Latest update

04/03/2026

Trademark type

Word

Nice classes

11, 37, 42

Filing date

07/05/2023

Registration date

09/03/2024

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

09/03/2024

Last transaction

04/03/2026

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

4

Owner type

03

Owner location

KR

Examiner

NKOJO, RHODA K

Law office

M80

Current location

FILE REPOSITORY (FRANCONIA)

Holders and representatives

Holders

POSCO Co., Ltd

Representatives

Stepehen P. McNamara St. Onge Steward Johnston & Reens LLC

Technical classification

Nice Classes

Class 11Class 37Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 11

Furnaces for melting metals; melting furnaces for industrial purposes; furnaces for reducing iron ores; melting furnaces for manufacturing reduced irons; heating furnaces for industrial purposes; industrial furnaces; garbage incinerators for industrial purposes; refractory furnaces; blast furnaces; nuclear reactors; incinerators; coke furnaces; combined heating and air-conditioning apparatus; air conditioning apparatus for industrial use; air conditioning apparatus for commercial buildings; water purification apparatus; industrial waste water purification plants; solar energy receivers; industrial boilers for power plants

Class 37

Maintenance of manufacturing facilities for reduced irons; maintenance of fluidized bed reduction reactors for iron oxides; maintenance of cleaning facilities for gases generated from furnaces; maintenance of manufacturing facilities for melted pig irons; maintenance of furnaces and ancillary fluidized bedscompactorsdrierssteam reformerscompressorsfor manufacturing iron and steel; repair of manufacturing facilities for reduced irons; repair of fluidized bed reduction reactors for iron oxides; repair of cleaning facilities for gases generated from furnaces; repair of manufacturing facilities for melted pig irons; repair of furnaces and ancillary fluidized bedscompactorsdrierssteam reformerscompressors for manufacturing iron and steel; installation of manufacturing facilities for reduced irons; installation of fluidized bed reduction reactors for iron oxides; installation of cleaning facilities for gases generated from furnaces; installation of manufacturing facilities for melted pig irons; installation of furnaces and ancillary fluidized bedscompactorsdrierssteam reformerscompressors for manufacturing iron and steel; furnace installation and repair; installation of industrial furnaces; blast furnaces installation

Class 42

Design of manufacturing facilities for reduced irons; design of fluidized bed reduction reactors and ancillary fluidized bedscompactorsdrierssteam reformerscompressorsfor manufacturing iron and steel from iron oxides; design of cleaning facilities for gases generated from furnaces; design of manufacturing facilities for melted pig irons; design of steelworks furnaces and steelworks furnace manufacturing facilities; engineering consulting services relating to iron and steel forming systems; scientific research relating to metals; engineering consulting services relating to iron briquette and pellet handling systems; technology evaluation of steel making machinery and equipment of others to determine conformity with certification standards in the field of steel making machinery and equipment; scientific research in the field of welding; electrical engineering services; engineering surveying

Publications

History of USPTO decisions and trademark events.

40 publications found

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

03/15/2025

OPNX

NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB

03/14/2025

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

02/27/2025

OPNR

NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB

02/27/2025

FICS

FINAL DISPOSITION NOTICE SENT TO IB

02/22/2025

FIMP

FINAL DISPOSITION PROCESSED

02/21/2025

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

12/04/2024

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

09/03/2024

R.PR

REGISTERED-PRINCIPAL REGISTER

09/03/2024

GPNX

NOTIFICATION PROCESSED BY IB

07/28/2024

GPNX

NOTIFICATION PROCESSED BY IB

07/01/2024

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

06/19/2024

ECDR

TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS

06/19/2024

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

06/19/2024

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

06/19/2024

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

06/18/2024

PUBO

PUBLISHED FOR OPPOSITION

06/18/2024

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

06/14/2024

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

06/13/2024

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

06/12/2024

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

05/29/2024

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

05/16/2024

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

05/16/2024

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

05/16/2024

ERFR

TEAS REQUEST FOR RECONSIDERATION RECEIVED

05/16/2024

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

05/01/2024

GNFR

FINAL REFUSAL E-MAILED

05/01/2024

CNFR

FINAL REFUSAL WRITTEN

05/01/2024

RFNT

REFUSAL PROCESSED BY IB

03/27/2024

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

03/26/2024

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

03/26/2024

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

03/26/2024

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

03/04/2024

RFRR

REFUSAL PROCESSED BY MPU

03/04/2024

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

02/09/2024

CNRT

NON-FINAL ACTION WRITTEN

02/08/2024

DOCK

ASSIGNED TO EXAMINER

02/06/2024

MAFR

APPLICATION FILING RECEIPT MAILED

10/03/2023

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

09/29/2023

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

09/28/2023

Continuous trademark protection

Get notified about every new filing that threatens HYREX or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.