(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

STJERNHOLM

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

STJERNHOLM

ST13

US500000079377699

Class

7, 9, 11

Filing

79377699

Registration

7490803

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

35

Latest update

03/08/2025

Trademark type

Combined

Nice classes

7, 9, 11

Filing date

05/02/2023

Registration date

09/03/2024

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

09/03/2024

Last transaction

03/08/2025

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

3

Owner type

84

Owner location

DK

Examiner

MANCA, ALBERTO

Current location

FILE REPOSITORY (FRANCONIA)

Mark description

The mark consists of the red stylized wording "STJERNHOLM" to the left of the which is placed a design of a star colored in red. These elements are underlined by a single red line.

Holders and representatives

Holders

STJERNHOLM A/S

Representatives

Eric T. Fingerhut Dykema Gossett, PLLC

Technical classification

Nice Classes

Class 7Class 9Class 11

Vienna Codes

No Vienna codes available.

Goods and services

Class 7

Industrial machine pressesmechanical screening and washing presses for use in purification plants; sand washers and sand washing plants being electric washing machines for industrial purposes for use in purification plantsbiogas plants and in agriculture; conveyors being machines; industrial machine pressesscrew presses; drum screens and drum filters being industrial machine presses in the nature of filter presses for sludge dewatering; industrial machineryelectromechanical machines for phosphor recycling; drum separators being parts of machines; transport systems for washing and pressingbelts for conveyors; sludge dewatering presses being industrial machine presses; filters in the form of band pass filters and automatic self-cleaning filters for motors and engines; filters in the form of band pass filters and automatic self-cleaning filters being parts of sand cleaning machinery; machines for cleaning of pipelines and piping systems being pipe cleaning machines; parts of machines for cleaning pipelines and piping systemsfilters for motors and engines; pump installations and pumping stationsliquidswaterwastewatersludgeslurryslitgritmudclaysuspension and fuel pumping stations being machines for pumping liquidswaterwastewatersludgeslurryslitgritmudclaysuspension and fuel; electric pumps; mixing machinesmixers for slurry tanks

Class 9

Measuringdetectingmonitoring and controlling devicestilt sensorsmotion detectors and monitoring instruments in the nature of wastewater monitors being water testing instrumentation for monitoring and detecting contamination used in plant controlin particular in purification plants

Class 11

Water treatment units for aerating and circulating water; polymerisation installations for the treatment of sludgewaste processing machines using chemical breakdown processes comprised of basinsagitators and storage tanks used for mixing and supply of polymer for sludge presses and decanters; water flushing apparatus and installations being water treatment units for circulating water for implementation in pondsequalizing tanks and larger pipelines; ventilation installations and apparatusair conditioning installations and apparatus; electric fans for air conditioning; UV disinfection plants being sanitizing apparatus; sewage treatment machines and machine tools for treatment of materialsin particular mechanical screens being sewage purification installations for use in sewage purification plants; filter band screens being structural parts of sewage purification installations for absorption of screen materials; hydraulic and motorized overflow screens being structural parts for industrial waste water and sewage purification plants; bar grate stokers with perforated plates being inlet screens as structural parts for sewage purification plants; water filtering apparatus in the nature of drum filters being machines for filtering and separation of particles in sewage purification plants

Publications

History of USPTO decisions and trademark events.

35 publications found

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

03/08/2025

NREP

NEW REPRESENTATIVE AT IB RECEIVED

03/07/2025

FICS

FINAL DISPOSITION NOTICE SENT TO IB

02/19/2025

FIMP

FINAL DISPOSITION PROCESSED

02/19/2025

OPNX

NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB

02/15/2025

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

01/27/2025

OPNR

NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB

01/26/2025

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

12/04/2024

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

09/03/2024

R.PR

REGISTERED-PRINCIPAL REGISTER

09/03/2024

GPNX

NOTIFICATION PROCESSED BY IB

07/28/2024

GPNX

NOTIFICATION PROCESSED BY IB

07/01/2024

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

06/18/2024

PUBO

PUBLISHED FOR OPPOSITION

06/18/2024

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

06/14/2024

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

06/13/2024

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

06/12/2024

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

05/29/2024

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

05/10/2024

XAEC

EXAMINER'S AMENDMENT ENTERED

05/10/2024

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

05/10/2024

GNEA

EXAMINERS AMENDMENT E-MAILED

05/10/2024

CNEA

EXAMINERS AMENDMENT -WRITTEN

05/10/2024

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

04/23/2024

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

04/23/2024

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

04/23/2024

RFNT

REFUSAL PROCESSED BY IB

03/19/2024

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

02/23/2024

RFRR

REFUSAL PROCESSED BY MPU

02/23/2024

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

02/02/2024

CNRT

NON-FINAL ACTION WRITTEN

02/01/2024

DOCK

ASSIGNED TO EXAMINER

01/29/2024

MAFR

APPLICATION FILING RECEIPT MAILED

09/05/2023

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

09/01/2023

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

08/31/2023

Continuous trademark protection

Get notified about every new filing that threatens STJERNHOLM or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.