(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

T.EN TECHNIP ENERGIES

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

T.EN TECHNIP ENERGIES

ST13

US500000079339785

Class

37, 41, 42

Filing

79339785

Registration

7209443

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

37

Latest update

03/04/2024

Trademark type

Combined

Nice classes

37, 41, 42

Filing date

06/23/2021

Registration date

11/07/2023

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

11/07/2023

Last transaction

11/07/2023

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

3

Owner type

34

Owner location

FR

Examiner

KUHN, RIO

Law office

N90

Current location

PUBLICATION AND ISSUE SECTION

Mark description

The mark consists of the wording "T.EN" in white in a blue and green circle with the wording "TECHNIP ENERGIES" in blue to the right of the circle.

Holders and representatives

Holders

T. F. (pessoa física)
T. F. (pessoa física)

Representatives

Jeffrey M. Becker Haynes and Boone, LLP

Technical classification

Nice Classes

Class 37Class 41Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 37

Constructions servicesbuilding construction; construction of public works and rural worksoffshore constructionspipeline constructionconcrete pouring and forming for building and other commercial or public concrete structuresconstruction of underground utilities and housing padsconstruction of oil and gaspetrochemical and energy refineries and plants; construction work supervision being construction management; information with respect to construction; Constructionmaintenance and repair of industrial installationsoffshore energy transition (carbon capture and sequestrationoffshore wind turbinesolar panel)

Class 41

Training services for industrial plantsproviding specialized professional training to employees in the fields of in process operationsfactory maintenanceanalytical control of process and product flowsenvironmental protection and safetyproject management and factory constructioncustomized training solutions integrating an interface design and advanced learning methodsdynamic simulation of operator training (OTS)coordinating the procurement and improvement of process control skills and solving operator problems

Class 42

Industrial plant design servicesconceptual process studiesconsolidation of process assembliesbasic studies required to support a set of technical design all containing the data necessary to a competent contractor for carrying out detailed engineering in the nature of engineering design services; detailed engineering services for industrial plantsonline non-downloadable software for purchasing materialdeveloping diagrams for pipework and instruments published for the constructiondeveloping detailed pipework drawingsincluding measuring and stress calculationsdrafting detailed drawings relating to instrumentationto electrical installations and to civil engineering worksmanaging supplier designscontrolling costs and bill booksstart-up proceduresdeveloping diagrams for pipework and process instruments and public services published for the detailed engineeringdrafting detailed maps of hazardous areas and plotsdrafting the main diagrams for pipeworkinstrumentationelectricity and civil engineering; maintenance engineering services for industrial plants; converting existing printed courses to digital media formatsconversion of data or documents from physical to electronic media; commissioning of industrial plantsonline non-downloadable software for construction management3D construction systemssubdivision of the system via the 3D model enabling 3D viewing of the systems and improving pre-commissioning and commissioning studies during the engineering phasetracking the progress of construction/pre-commissioning/commissioning up to deliveryQA/QC statistics and reportsinterface management between different phases of the project lifecycle (engineeringconstructionpre-commissioningcommissioning); industrial design; architecturearchitectural services; research and development of industrial systems and equipment; technical research in the fields of engineeringdesignconstructionproject management and processing technologies

Publications

History of USPTO decisions and trademark events.

37 publications found

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

03/04/2024

FICS

FINAL DISPOSITION NOTICE SENT TO IB

02/08/2024

FIMP

FINAL DISPOSITION PROCESSED

02/08/2024

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

02/07/2024

OPNX

NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB

11/12/2023

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

11/07/2023

R.PR

REGISTERED-PRINCIPAL REGISTER

11/07/2023

ADCH

CHANGE OF NAME/ADDRESS REC'D FROM IB

11/03/2023

NREP

NEW REPRESENTATIVE AT IB RECEIVED

10/29/2023

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

10/11/2023

OPNR

NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB

10/11/2023

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

08/22/2023

PUBO

PUBLISHED FOR OPPOSITION

08/22/2023

GPNX

NOTIFICATION PROCESSED BY IB

08/21/2023

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

08/02/2023

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

08/02/2023

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

08/02/2023

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

08/02/2023

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

08/02/2023

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

08/02/2023

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

07/18/2023

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

05/04/2023

EWAF

TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS

05/04/2023

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

05/04/2023

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

05/04/2023

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

12/29/2022

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

12/29/2022

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

12/29/2022

RFNT

REFUSAL PROCESSED BY IB

07/26/2022

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

07/01/2022

RFRR

REFUSAL PROCESSED BY MPU

07/01/2022

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

06/29/2022

CNRT

NON-FINAL ACTION WRITTEN

06/28/2022

MAFR

APPLICATION FILING RECEIPT MAILED

05/10/2022

DOCK

ASSIGNED TO EXAMINER

05/06/2022

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

05/06/2022

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

05/05/2022

Continuous trademark protection

Get notified about every new filing that threatens T.EN TECHNIP ENERGIES or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.