(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

THE FUTURE RUNS GREEN

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

THE FUTURE RUNS GREEN

ST13

US500000079330047

Class

7, 9, 37, 42

Filing

79330047

Registration

6998488

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

33

Latest update

09/27/2025

Trademark type

Word

Nice classes

7, 9, 37, 42

Filing date

10/19/2021

Registration date

03/14/2023

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

03/14/2023

Last transaction

09/27/2025

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

4

Owner type

84

Owner location

FI

Examiner

KEELEY,ALISON REBECCA

Law office

M40

Current location

PUBLICATION AND ISSUE SECTION

Holders and representatives

Holders

E. O. (pessoa física)

Representatives

Richard LaCava ArentFox Schiff LLP

Technical classification

Nice Classes

Class 7Class 9Class 37Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 7

Machines and parts of machines used in the production and processing of concrete and concrete elementsnamely mixing and precast concrete casting machines and structural parts thereofmold and casting bed preparation and cleaning machines and structural parts thereofprecast element moving and lifting machines and structural parts thereof; Machines in the nature of concrete and concrete element finishing machinesconcrete construction machines for the manufacture and production of concrete elementsconcrete panels and walls; Industrial robots for manufacturing

Class 9

Computers; downloadable computer software for reinforcement calculationstorage and inventory managementtruckload planningmonitoring installation of precast concrete elementsslabs and panels; downloadable mobile software for accessing precast manufacturing data and for controlling functionalities thereof; recorded manufacturing software for controlling concrete mixingcasting and finishing machines and slab positioning in factory environment; downloadable computer software for optimization of precast concrete productioncreating reports and for visualization of factory operations datamonitoring capacity in precast factoriesmanaging materials in precast factoriesmanaging quality in precast factories; downloadable software for financial and personnel management of projects and staffing and for monitoring and calculating profitability of projects; sensors in the nature of temperature sensorshumidity sensorshardness sensors and sensors for obtaining data on progressing of the casting process on a precast concrete production linemeasurement and signalling devices in the nature of devices for monitoring casting process and for measuring and receiving and transmitting measurement data between production control software and machines and equipment in precast concrete factory; downloadable computer software for controlmanagement and maintenance of machinesdevices and equipment in concrete and construction industry in the nature of collecting and processing data concerning wear and tear for predicting maintenance need and lifeline

Class 37

Building construction; repair and maintenance of machinescomputerstools and appliances in the construction industrynamely installationrepair and maintenance of computersinstallationrepair and maintenance of precast concrete casting machinesmachines for preparing casting beds and moldsmachines for moving and lifting raw materials and precast concrete elements; repair and maintenance appliances that are for drying and storing precast concrete elements; repairinstallation and maintenance of industrial robots repair and maintenance of concrete manufacturing machines and appliances and electrical appliance installation and repair for production lines and for factoriesin the nature of electric appliance installation and repair

Class 42

Scientific and technological services namely researchdesign and development of precast machinery and precast concrete factory automationin the field of construction; Scientific research and technological servicesnamely civil engineering services and scientific carbon footprint evaluation services in the field of concrete manufacturingproduction and processing; Scientific and technological servicesnamely design and development of computer software and computer hardware and machines for precast concrete manufacturingprocessingmovingdryingstoring; engineering services; Researchdevelopment and design servicesnamely researchdevelopment and design of precast concrete characteristicsprecast concrete mixing machinescasting machinescast preparation machinesconcrete element moving and lifting machines and optimal drying and storing facilities all relating to manufacturingproduction and processing of concrete; Scientific research servicesnamely research of software and hardware requirements and optimization relating to the computerized automatization of industrial processes; design and development of computer hardware and software; Software as a Service (SaaS) services featuring software for reinforcement calculationfor storage and inventory managementfor truckload planningfor monitoring installation of precast concrete elementsslabs and panelsfor accessing precast manufacturing data and for controlling functionalities thereoffor controlling concrete mixingcasting and finishing machines and slab positioning in factory environmentfor optimization of precast concrete productionfor creating reports and for visualization of factory operations datafor monitoring capacity in precast factoriesfor managing materials in precast factoriesfor managing quality in precast factoriesfor management of projects and staffing and for monitoring and calculating profitability of projectsfor controlmanagement and maintenance of machinesdevices and equipment in concrete and construction industry in the nature of collecting and processing data concerning wear and tear for predicting maintenance need and lifeline; technical and technological consultationnamely engineering consulting related to engineering issues for manufacturing of concrete elements; technical and technological consultingnamely computer hardware consulting and software consulting; Installationupdating and maintenance of computer software

Publications

History of USPTO decisions and trademark events.

33 publications found

NREP

NEW REPRESENTATIVE AT IB RECEIVED

09/26/2025

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

07/26/2023

FICS

FINAL DISPOSITION NOTICE SENT TO IB

06/30/2023

FIMP

FINAL DISPOSITION PROCESSED

06/30/2023

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

06/14/2023

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

03/14/2023

R.PR

REGISTERED-PRINCIPAL REGISTER

03/14/2023

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

12/27/2022

PUBO

PUBLISHED FOR OPPOSITION

12/27/2022

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

12/07/2022

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

11/18/2022

XAEC

EXAMINER'S AMENDMENT ENTERED

11/18/2022

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

11/18/2022

GNEA

EXAMINERS AMENDMENT E-MAILED

11/18/2022

CNEA

EXAMINERS AMENDMENT -WRITTEN

11/18/2022

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

10/19/2022

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

10/19/2022

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

10/19/2022

CHAN

APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED

08/26/2022

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

08/26/2022

ECDR

TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS

08/26/2022

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

08/26/2022

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

08/26/2022

COAR

TEAS CHANGE OF OWNER ADDRESS RECEIVED

08/26/2022

RFNT

REFUSAL PROCESSED BY IB

08/23/2022

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

08/03/2022

RFRR

REFUSAL PROCESSED BY MPU

08/03/2022

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

08/02/2022

CNRT

NON-FINAL ACTION WRITTEN

08/01/2022

DOCK

ASSIGNED TO EXAMINER

07/26/2022

MAFR

APPLICATION FILING RECEIPT MAILED

01/08/2022

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

01/04/2022

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

12/30/2021

Continuous trademark protection

Get notified about every new filing that threatens THE FUTURE RUNS GREEN or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.