(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

ENGINEERED BY BEGA

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

ENGINEERED BY BEGA

ST13

US500000079290017

Class

9, 11, 37, 42

Filing

79290017

Registration

6303412

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

26

Latest update

06/25/2026

Trademark type

Word

Nice classes

9, 11, 37, 42

Filing date

06/04/2020

Registration date

03/30/2021

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

03/30/2021

Last transaction

06/25/2026

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

4

Owner type

99

Owner location

DE

Examiner

CORWIN, CHARLOTTE K

Law office

N10

Current location

PUBLICATION AND ISSUE SECTION

Holders and representatives

Holders

B. K. (pessoa física)

Representatives

Candice M. Reder BakerHostetler

Technical classification

Nice Classes

Class 9Class 11Class 37Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 9

Apparatus and instruments for conductingswitchingtransformingaccumulatingregulating or controlling electricity; downloadable computer software for controlling and monitoring temperature and lighting installations; electrical control apparatus for fans; electric and electronic control and regulating apparatus for luminaires and lighting installations; thermal switchestemperature switches; temperature monitoring devices for controlling the operation of luminaires; heat sinksnamely coolers for electric and electronic components/processors; heat sinks for conducting heat away from electrical components; temperature sensors; control and monitoring apparatus and instruments for temperature and lighting installations; temperature controlling apparatus for residential quarters; thermal controlsnamely temperature controllers for controlling the temperature of residential quarters; optical and electrical cable for use in equipment for sensing and measuring temperature; voltage stabilizing power supply

Class 11

Electric light fittings for outdoor lighting fixturesexcept light bulbselectric and discharge lamps; apparatus and equipment for lightingnamely lighting installationsreplacement parts therefor; exterior spotwallflood lightsexcept electric incandescent lamps and discharge lamps; led luminaires; lamp reflectors; reflectors for light control; reflectors for wide area lighting fixtures

Class 37

Installation of lighting apparatus; installation of lighting systems; advisory services relating to the installation of lighting apparatus; repair or maintenance of electric lighting apparatus; providing information relating to the repair or maintenance of electric lighting apparatus

Class 42

Design of lighting systems; technical planning and consulting in the field of light engineering; technical planning and technical project management for the development of lighting equipment

Publications

History of USPTO decisions and trademark events.

26 publications found

NREP

NEW REPRESENTATIVE AT IB RECEIVED

06/25/2026

REM3

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED

03/30/2026

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

08/08/2021

FICS

FINAL DISPOSITION NOTICE SENT TO IB

07/15/2021

FIMP

FINAL DISPOSITION PROCESSED

07/15/2021

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

06/30/2021

R.PR

REGISTERED-PRINCIPAL REGISTER

03/30/2021

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

01/12/2021

PUBO

PUBLISHED FOR OPPOSITION

01/12/2021

GPNX

NOTIFICATION PROCESSED BY IB

01/11/2021

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

12/23/2020

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

12/23/2020

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

12/23/2020

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

12/07/2020

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

11/23/2020

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

11/23/2020

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

11/23/2020

RFNT

REFUSAL PROCESSED BY IB

10/25/2020

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

10/06/2020

RFRR

REFUSAL PROCESSED BY MPU

10/05/2020

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

09/17/2020

CNRT

NON-FINAL ACTION WRITTEN

09/16/2020

DOCK

ASSIGNED TO EXAMINER

09/04/2020

MAFR

APPLICATION FILING RECEIPT MAILED

07/28/2020

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

07/24/2020

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

07/23/2020

Continuous trademark protection

Get notified about every new filing that threatens ENGINEERED BY BEGA or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.