(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

SUMI-SOLAR

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

SUMI-SOLAR

ST13

US500000079257857

Class

9, 37

Filing

79257857

Registration

6021074

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

26

Latest update

04/01/2025

Trademark type

Word

Nice classes

9, 37

Filing date

01/30/2019

Registration date

03/31/2020

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

03/31/2020

Last transaction

04/01/2025

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

4

Owner type

03

Owner location

JP

Examiner

SALCIDO, JOHN

Law office

N40

Current location

PUBLICATION AND ISSUE SECTION

Holders and representatives

Holders

Sumitomo Electric Industries, LTD.

Representatives

Boris Umansky Ladas & Parry LLP

Technical classification

Nice Classes

Class 9Class 37

Vienna Codes

No Vienna codes available.

Goods and services

Class 9

Photovoltaic apparatus and installations for generating solar electricityphotovoltaic units for the production of electrical power comprised of photovoltaic solar modulesinverterselectric junction boxespower cablesmounts for photovoltaic solar modules; photovoltaic installations for generating electricitysolar modules for production of electricitysolar thermal and electric receiverstracking mechanisms and concentrating opticscontrol algorithms; solar panels for the production of electricity; solar cells; photovoltaic solar modules; photovoltaic cells; photovoltaic modules; automatic solar tracking sensors; power distribution or control machines and apparatuselectrical power distribution units; testing and measuring equipment for use in testing the performance and efficiency of power plant equipment; electrical cells and batteries; electricity meters; magnetometers; computer software for measuring power generation performance of solar panelsdownloadable or recorded; computers; computer software for design of photovoltaic power generation systemsdownloadable or recorded; computer software for simulation of photovoltaic power generation systemsdownloadable or recorded; computer software for monitoring and controlling photovoltaic power generation systemsdownloadable or recorded; electric cables and wires; magnetic cores; resistance wires; electrodes

Class 37

Installationmaintenance and repair of photovoltaic cells and modules; installationmaintenance and repair of solar installations for generating power; installationrepair and maintenance of photovoltaic apparatus and installations for generating solar electricity; maintenance of photovoltaic equipment; construction of solar photovoltaic systems; advisory services relating to the construction of solar photovoltaic systems; repair and maintenance of power generators; repair and maintenance of power distribution or control machines and apparatus

Publications

History of USPTO decisions and trademark events.

26 publications found

REM3

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED

03/31/2025

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

08/29/2020

FICS

FINAL DISPOSITION NOTICE SENT TO IB

08/10/2020

FIMP

FINAL DISPOSITION PROCESSED

08/10/2020

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

06/30/2020

R.PR

REGISTERED-PRINCIPAL REGISTER

03/31/2020

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

01/14/2020

PUBO

PUBLISHED FOR OPPOSITION

01/14/2020

GPNX

NOTIFICATION PROCESSED BY IB

01/10/2020

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

12/25/2019

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

12/25/2019

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

12/25/2019

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

12/09/2019

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

12/06/2019

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

12/06/2019

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

12/06/2019

RFNP

REFUSAL PROCESSED BY IB

06/28/2019

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

06/07/2019

RFRR

REFUSAL PROCESSED BY MPU

06/07/2019

MAFR

APPLICATION FILING RECEIPT MAILED

05/24/2019

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

05/21/2019

CNRT

NON-FINAL ACTION WRITTEN

05/20/2019

DOCK

ASSIGNED TO EXAMINER

05/20/2019

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

05/20/2019

LIMI

LIMITATION FROM ORIGINAL APPLICATION ENTERED

05/16/2019

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

05/02/2019

Continuous trademark protection

Get notified about every new filing that threatens SUMI-SOLAR or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.