(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

SENVION WE MAKE WIND PERFORM.

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

SENVION WE MAKE WIND PERFORM.

ST13

US500000079248299

Class

7, 9, 35, 37, 40, 42

Filing

79248299

Registration

5940617

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

31

Latest update

08/04/2026

Trademark type

Combined

Nice classes

7, 9, 35, 37, 40, 42

Filing date

09/17/2018

Registration date

12/24/2019

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

07/10/2026

Last transaction

08/04/2026

Responsible office

United States Patent and Trademark Office

Status code

709

Official register

Principal Register

Drawing code

5

Owner type

27

Owner location

DE

Examiner

SABAGH, LAILA TAREK

Law office

N90

Current location

PUBLICATION AND ISSUE SECTION

Holders and representatives

Holders

Senvion GmbH

Representatives

LICHTE Rechtsanwälte

Technical classification

Nice Classes

Class 7Class 9Class 35Class 37Class 40Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 7

Wind-powered machineswind-powered electricity generatorswind-powered machines for generating electrical and mechanical energy; turbinesin particular wind turbinesexcept for land vehicles; structural parts and accessories for wind-powered electricity generators and wind-powered machines for generating electrical and mechanical energyin particular rotor bladesrotor consolesblade hubsmachine housingsyaw ringsyaw gearsbrakesmain drive shaftsuniversal jointsgearsgear boxescouplingsmotorsmechanical rotor adjusterselectric generatoremergency power generators

Class 9

Electric installation materialswitch cabinets in the nature of switch boxes designed to house electric switches; electric and electronic instruments and apparatus for recordingprocessingstorage and transmission of datacomputer hardwareelectronic data processing apparatus; voltage regulators for electric powerapparatus for regulating electric currentelectricity limiters; electrical and electronic regulatingcheckingcontrol and monitoring apparatus and instrumentselectric or electronic monitorsmeter and sensors for measuring turbine performance and power generation in wind power plants; data processing equipment; computers; computer software for acquisition of wind turbine datadata management of wind power plantsoperatingregulating and controlling wind turbines and data transmission with wind turbines; computer network interface devices; voltage surge protectors; vibration sensors; watt-hour meter; electric convertersinverter units; electric transformers; all afore-mentioned goods for wind power plants and wind farms

Class 35

Professional business consultancy with regard to wind power plants and wind farms

Class 37

Building construction in the field of wind power plants; installation of wind power plants; installation services for wind farmsinstallation of wind turbines; maintenance services in the nature of repairing wind power plantsrebuilding machines that have been worn or partially destroyedwind power plants; maintenance and repair of wind power plants; assembly services as a part of the installation of rotor blades for others

Class 40

Production of energy using wind power; production of electricity using wind power

Class 42

Remote control and monitoring servicesremote maintenance through computerised retrieval of wind power plants and wind farmsin particular via the Internet; conducting technical measurementsinspections and calculations in the range of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the field of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; engineering services in the nature of technical planning and developmentas well as engineering technical project management and consultancy therefor in the field of wind power plants; engineering services for calculationdimensioning and design of rotor blades; technical research for wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms; quality controltechnical condition monitoring of rotor blades

Publications

History of USPTO decisions and trademark events.

31 publications found

C71T

CANCELLED SECTION 71

07/10/2026

NREP

NEW REPRESENTATIVE AT IB RECEIVED

05/21/2022

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

04/24/2020

FICS

FINAL DISPOSITION NOTICE SENT TO IB

04/02/2020

FIMP

FINAL DISPOSITION PROCESSED

04/02/2020

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

03/24/2020

R.PR

REGISTERED-PRINCIPAL REGISTER

12/24/2019

PUBO

PUBLISHED FOR OPPOSITION

10/08/2019

GPNX

NOTIFICATION PROCESSED BY IB

10/05/2019

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

09/18/2019

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

09/18/2019

NPUB

NOTICE OF PUBLICATION

09/18/2019

ALIE

ASSIGNED TO LIE

09/05/2019

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

09/04/2019

CNEA

EXAMINERS AMENDMENT MAILED

09/03/2019

XAEC

EXAMINER'S AMENDMENT ENTERED

09/03/2019

CNEA

EXAMINERS AMENDMENT -WRITTEN

09/03/2019

DOCK

ASSIGNED TO EXAMINER

08/22/2019

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

07/13/2019

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

07/12/2019

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

07/12/2019

NREP

NEW REPRESENTATIVE AT IB RECEIVED

04/19/2019

RFNT

REFUSAL PROCESSED BY IB

02/02/2019

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

01/17/2019

RFRR

REFUSAL PROCESSED BY MPU

01/17/2019

MAFR

APPLICATION FILING RECEIPT MAILED

01/08/2019

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

01/05/2019

CNRT

NON-FINAL ACTION WRITTEN

01/04/2019

DOCK

ASSIGNED TO EXAMINER

01/04/2019

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

01/04/2019

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

12/27/2018

Continuous trademark protection

Get notified about every new filing that threatens SENVION WE MAKE WIND PERFORM. or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.