(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

PUKATTO

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

PUKATTO

ST13

US500000079239087

Class

9, 19

Filing

79239087

Registration

5809177

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

40

Latest update

03/03/2026

Trademark type

Combined

Nice classes

9, 19

Filing date

02/19/2018

Registration date

07/23/2019

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

02/06/2026

Last transaction

03/03/2026

Responsible office

United States Patent and Trademark Office

Status code

709

Official register

Principal Register

Drawing code

3

Owner type

03

Owner location

JP

Examiner

CHOE, JULIE H

Law office

N80

Current location

PETITIONS OFFICE

Mark description

The mark consists of "PUKATTO" in stylized letters. The letters "P" and "K" are capitalized. The letters "TT" are capitalized and connected at the top. The letters "U" and "O" are lowercase. The letter "A" is shaped like a stylized water droplet. Beneath "PUKATTO" are two wavy lines.

Holders and representatives

Holders

Sumitomo Mitsui Construction Co., Ltd.

Representatives

Laura K. Pitts Buchanan Ingersoll & Rooney PC

Technical classification

Nice Classes

Class 9Class 19

Vienna Codes

No Vienna codes available.

Goods and services

Class 9

Water floatation solar system for power generation consisting of solar panelssolar panel standspolyethylene floats and their connection parts; water floatation system assemblies for solar power generation consisting of solar panelssolar panel standspolyethylene floats and their connection parts; floatation system for solar power generation comprising solar panelssolar panel standspolyethylene floatsbinding bandstheir connection partssold as a unit; solar panels for the production of electricity; floating photovoltaic solar panel arrays and the components for the same for the production of electricity; solar cells; floating solar rack system specially designed to hold solar panels for the generation of electricity; floating stands specially adapted for solar panels for solar power generation and the production of energy; stands specially adapted for solar panels for solar power generation and the production of energy; floating stands specially adapted for photovoltaic installations for generating electricity; stands specially adapted for photovoltaic installations for generating electricity; floating stands specially adapted for solar cells; stands specially adapted for solar cells; floats made of polyethylene specially adapted for floating solar panels for solar power generation and the production of energy on waterborne locations; floats made of polyethylene specially adapted for floating photovoltaic installations for generating electricity on waterborne locations; floats made of polyethylene specially adapted for floating solar cells on waterborne locations; photovoltaic cells and modules for floating photovoltaic power plants; photovoltaic cells and modules for photovoltaic power plants on water

Class 19

Floating standsprefabricatedfor loading solar panelsnot of metal; standsprefabricatedfor loading solar panelsnot of metal; floating standsprefabricatedfor loading photovoltaic installations for generating electricitynot of metal; standsprefabricatedfor loading photovoltaic installations for generating electricitynot of metal; floating standsprefabricatedfor loading solar cellsnot of metal; standsprefabricatedfor loading solar cellsnot of metal; polyethylene floatsprefabricatedfor floating solar panels on waterborne locationsnot of metal; polyethylene floatsprefabricatedfor floating photovoltaic installations for generating electricity on waterborne locationsnot of metal; polyethylene floatsprefabricatedfor floating solar cells on waterborne locationsnot of metal; polyethylene floatsprefabricatednot of metal; prefabricated buildingsnot of metal; ceramic construction materialsbricksrefractory construction materials not of metal; construction materials made of plasticplastic wallboards; synthetic construction materialssynthetic flooring materials; asphalt and asphalt felt for building and construction; rubber materials for building and constructionrubber cove bases; plaster; materials made of lime for building and construction; gypsum materials for building and construction; cement and cement mixes; moulds for forming cement productsnot of metalcement posts; greenhousetransportable for household purposesnot of metal; non-metal structures for constructing floating solar panels; non-metal structures for constructing floating photovoltaic installations; non-metal building materialsfiberglass panels and plastic pipe supportsfor constructing floating solar panel arrays

Publications

History of USPTO decisions and trademark events.

40 publications found

C71T

CANCELLED SECTION 71

02/06/2026

REM3

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED

07/23/2024

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

12/01/2019

FICS

FINAL DISPOSITION NOTICE SENT TO IB

11/08/2019

FIMP

FINAL DISPOSITION PROCESSED

11/08/2019

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

10/23/2019

CORR

CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED

10/22/2019

CRCV

CORRECTION TRANSACTION RECEIVED FROM IB

08/23/2019

R.PR

REGISTERED-PRINCIPAL REGISTER

07/23/2019

CHPB

POST PUBLICATION AMENDMENT - ENTERED

06/14/2019

APET

ASSIGNED TO PETITION STAFF

06/13/2019

EPPA

TEAS POST PUBLICATION AMENDMENT RECEIVED

05/22/2019

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

05/07/2019

PUBO

PUBLISHED FOR OPPOSITION

05/07/2019

GPNX

NOTIFICATION PROCESSED BY IB

05/03/2019

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

04/17/2019

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

04/17/2019

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

04/17/2019

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

03/26/2019

XAEC

EXAMINER'S AMENDMENT ENTERED

03/25/2019

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

03/25/2019

GNEA

EXAMINERS AMENDMENT E-MAILED

03/25/2019

CNEA

EXAMINERS AMENDMENT -WRITTEN

03/25/2019

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

03/21/2019

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

03/20/2019

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

03/20/2019

CNRT

NON-FINAL ACTION MAILED

01/18/2019

CNRT

NON-FINAL ACTION WRITTEN

01/17/2019

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

01/04/2019

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

01/03/2019

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

01/03/2019

RFNT

REFUSAL PROCESSED BY IB

09/29/2018

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

09/10/2018

RFRR

REFUSAL PROCESSED BY MPU

09/10/2018

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

08/31/2018

CNRT

NON-FINAL ACTION WRITTEN

08/30/2018

MAFR

APPLICATION FILING RECEIPT MAILED

08/28/2018

DOCK

ASSIGNED TO EXAMINER

08/24/2018

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

08/24/2018

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

08/23/2018

Continuous trademark protection

Get notified about every new filing that threatens PUKATTO or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.