(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

L D LITHO DECOR

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

L D LITHO DECOR

ST13

US500000079237311

Class

6, 17, 19, 37, 42

Filing

79237311

Registration

5802870

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

39

Latest update

03/06/2025

Trademark type

Combined

Nice classes

6, 17, 19, 37, 42

Filing date

09/29/2017

Registration date

07/16/2019

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

07/16/2019

Last transaction

03/06/2025

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

3

Owner type

99

Owner location

DE

Examiner

BEGGS, MONICA

Law office

L50

Current location

PUBLICATION AND ISSUE SECTION

Mark description

The mark consists of a square with rounded edges containing the stylized wording "LD" in the top-right corner. The wording "LITHO" is written above the word "DECOR" in the bottom left corner of the square.

Holders and representatives

Holders

Lithodecor Fassaden GmbH
D. S. (pessoa física)

Representatives

Mark P. Stone Law Office of Mark P. Stone

Technical classification

Nice Classes

Class 6Class 17Class 19Class 37Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 6

Building materials of metal or mainly of metalfloor boards and panelsceiling and roof boards and panelswall boards and panelsfasciastructural joint connectorsreinforcement materialswindow framescanopies and awningsbeamsjoistscolumns and postsaluminum sheet metalsoffits; sheet metalexpanded metal; wire cloth of metal or mainly of metal; adjusting and leveling parts of metal or mainly of metal for buildingadjusters for adjusting the height of building components in building constructions; metal screwscotter pinsbolts; spacer brackets of metal or mainly of metal for building; fixing anchors of metal or mainly of metal for building; window sills of metal or mainly of metal; window sills of metal and components of metal for window sills; cladding of metal for construction and buildingfor facades and roofs; construction elements made of metalsupports for receiving curtain-type facade parts; roofing and facade building panels of metal with integrated solar cells

Class 17

Sealingthermal insulatinginsulating materials; insulating paintsinsulating varnishesinsulating fabricsinsulating plaster; substances for insulating buildings against moisture; semi-processed artificial and synthetic resins; fiberglass fabrics for building insulation; insulating tapes; heat insulators for use in construction; parts for exterior wall heat insulation systemsgrid mats of glass fiber fabric and/or plastic ; plastic films for packingcushioningstuffing purposes; adhesive tapes and strips for building

Class 19

Building materialsnot of metal or mainly not of metalin particularprofile rails and corner protection railsfinishing profiles; non-metal adjusting and leveling partsadjusters for adjusting the height of building components in building constructions; non-metal window sills; natural and artificial stone; bonding mortar for building purposes; building materialsquartzplaster; sealer coatings sold as an integral component of non-metal tilesnatural stonemolded resins for construction purposes; wall and ceiling panelsnot of metal; fabric embedding compounds for buildingreinforcing materialsnot of metalfor building; erosion control fabrics for construction usenot of metal or mainly not of metalin the nature of stabilizing fabrics; building glassin particularglass facade panels for building purposes; ceramic tiles for liningfor building purposes for facades and roofs; construction elements not made of metalsupports for mounting curtain-type facade parts ; roofing and facade building panelsnot of metalwith integrated solar cells

Class 37

Building construction; building construction consultancy; installation of building insulation; construction project management services

Class 42

Architectural services; consultancy in the field of energy measurement to improve energy efficiency; interior and exterior design consultationconsulting in the field of color design for the interior and exterior of buildings

Publications

History of USPTO decisions and trademark events.

39 publications found

PUM1

OFFICE ACTION ISSUED POU1

03/06/2025

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

02/26/2025

E15R

TEAS SECTION 15 RECEIVED

01/15/2025

ES71

TEAS SECTION 71 RECEIVED

01/15/2025

REM3

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED

07/16/2024

ADCH

CHANGE OF NAME/ADDRESS REC'D FROM IB

02/04/2023

CHLD

CHANGE OF OWNER RECEIVED FROM IB

03/12/2021

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

11/22/2019

FICS

FINAL DISPOSITION NOTICE SENT TO IB

11/01/2019

FIMP

FINAL DISPOSITION PROCESSED

11/01/2019

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

10/16/2019

R.PR

REGISTERED-PRINCIPAL REGISTER

07/16/2019

GPNX

NOTIFICATION PROCESSED BY IB

05/03/2019

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

04/30/2019

PUBO

PUBLISHED FOR OPPOSITION

04/30/2019

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

04/17/2019

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

04/17/2019

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

04/10/2019

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

03/19/2019

XAEC

EXAMINER'S AMENDMENT ENTERED

03/19/2019

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

03/19/2019

GNEA

EXAMINERS AMENDMENT E-MAILED

03/19/2019

CNEA

EXAMINERS AMENDMENT -WRITTEN

03/19/2019

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

03/07/2019

GNFR

FINAL REFUSAL E-MAILED

03/07/2019

CNFR

FINAL REFUSAL WRITTEN

03/07/2019

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

02/08/2019

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

02/08/2019

ALIE

ASSIGNED TO LIE

02/07/2019

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

02/05/2019

RFNT

REFUSAL PROCESSED BY IB

09/01/2018

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

08/16/2018

RFRR

REFUSAL PROCESSED BY MPU

08/16/2018

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

08/03/2018

CNRT

NON-FINAL ACTION WRITTEN

08/02/2018

MAFR

APPLICATION FILING RECEIPT MAILED

07/31/2018

DOCK

ASSIGNED TO EXAMINER

07/27/2018

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

07/27/2018

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

07/26/2018

Continuous trademark protection

Get notified about every new filing that threatens L D LITHO DECOR or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.