(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

UBBINK BUILD SMART.

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

UBBINK BUILD SMART.

ST13

US500000079228717

Class

6, 9, 17, 19, 37

Filing

79228717

Registration

6564600

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

50

Latest update

05/30/2022

Trademark type

Combined

Nice classes

6, 9, 17, 19, 37

Filing date

12/20/2017

Registration date

11/23/2021

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

11/23/2021

Last transaction

11/23/2021

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

3

Owner type

26

Owner location

NL

Examiner

BROWN, TINA

Law office

M90

Current location

PUBLICATION AND ISSUE SECTION

Mark description

The mark consists of a red rectangle containing a red triangle in the center of a white outline of a roof above the wording "UBBINK" in stylized black font above the wording "BUILD SMART." in red stylized font.

Holders and representatives

Holders

Ubbink B.V.

Representatives

Roberto Ledesma Law Office of Roberto Ledesma

Technical classification

Nice Classes

Class 6Class 9Class 17Class 19Class 37

Vienna Codes

No Vienna codes available.

Goods and services

Class 6

Transportable buildings of metal; non-electric cables and wires of common metal; pipes and tubes of metal

Class 9

Solar cells

Class 17

Gutta-percha; asbestos; mica; plastics in extruded form for use in manufacture; packing materials of rubber or plastics; sealing and insulating materials of rubber or plastics; flexible pipesnot of metal

Class 19

Non-metallic rigid pipes for building; asphaltpitch and bitumen; non-metallic transportable buildings

Class 37

Repair and maintenance of flue gas removal systems and heating and ventilation apparatus; installation of flue gas removal systems; installation of heating and ventilation apparatus

Publications

History of USPTO decisions and trademark events.

50 publications found

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

05/30/2022

FICS

FINAL DISPOSITION NOTICE SENT TO IB

05/07/2022

FIMP

FINAL DISPOSITION PROCESSED

05/07/2022

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

02/23/2022

R.PR

REGISTERED-PRINCIPAL REGISTER

11/23/2021

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

09/07/2021

PUBO

PUBLISHED FOR OPPOSITION

09/07/2021

GPNX

NOTIFICATION PROCESSED BY IB

09/04/2021

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

08/18/2021

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

08/18/2021

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

08/18/2021

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

08/03/2021

XAEC

EXAMINER'S AMENDMENT ENTERED

08/03/2021

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

08/03/2021

GNEA

EXAMINERS AMENDMENT E-MAILED

08/03/2021

CNEA

EXAMINERS AMENDMENT -WRITTEN

08/03/2021

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

07/28/2021

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

07/27/2021

ERFR

TEAS REQUEST FOR RECONSIDERATION RECEIVED

07/27/2021

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

06/29/2021

GNFR

FINAL REFUSAL E-MAILED

06/29/2021

CNFR

FINAL REFUSAL WRITTEN

06/29/2021

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

05/27/2021

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

05/26/2021

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

05/26/2021

GNRN

NOTIFICATION OF NON-FINAL ACTION E-MAILED

11/27/2020

GNRT

NON-FINAL ACTION E-MAILED

11/27/2020

CNRT

NON-FINAL ACTION WRITTEN

11/27/2020

ALIE

ASSIGNED TO LIE

11/20/2020

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

05/06/2020

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

10/29/2019

OPNX

NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB

09/06/2019

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

08/21/2019

OPNR

NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB

08/21/2019

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

04/29/2019

GNS3

NOTIFICATION OF LETTER OF SUSPENSION E-MAILED

10/29/2018

GNSL

LETTER OF SUSPENSION E-MAILED

10/29/2018

CNSL

SUSPENSION LETTER WRITTEN

10/29/2018

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

10/03/2018

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

10/02/2018

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

10/02/2018

RFNT

REFUSAL PROCESSED BY IB

04/20/2018

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

04/04/2018

RFRR

REFUSAL PROCESSED BY MPU

04/04/2018

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

03/31/2018

CNRT

NON-FINAL ACTION WRITTEN

03/30/2018

DOCK

ASSIGNED TO EXAMINER

03/30/2018

MAFR

APPLICATION FILING RECEIPT MAILED

03/23/2018

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

03/19/2018

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

03/15/2018

Continuous trademark protection

Get notified about every new filing that threatens UBBINK BUILD SMART. or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.