(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

WINERGETIC

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

WINERGETIC

ST13

US500000079221169

Class

6, 19

Filing

79221169

Registration

5624663

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

39

Latest update

02/28/2026

Trademark type

Word

Nice classes

6, 19

Filing date

09/29/2017

Registration date

12/11/2018

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

06/27/2025

Last transaction

02/28/2026

Responsible office

United States Patent and Trademark Office

Status code

709

Official register

Principal Register

Drawing code

4

Owner type

13

Owner location

PL

Examiner

LEE, DOUGLAS

Law office

M20

Current location

PUBLICATION AND ISSUE SECTION

Holders and representatives

Holders

OKNOPLAST IP MANAGEMENT SPÓLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA SPÓLKA KOMANDYTOWA
KALLISTO 7 SPÓLKA Z OGRANICZONA ODPOWIE DZIALNOSCIA SPÓLKA KOMANDYTOWA

Representatives

Nicholas D Wells Legends Law Group, PLLC

Technical classification

Nice Classes

Class 6Class 19

Vienna Codes

No Vienna codes available.

Goods and services

Class 6

Windowsbalcony windowsterrace windowsroller shuttersexterior roller blinds for guiding lightdoorsbalcony doorsterrace doorsfolding shutterswindowsillsgatesgarage doorswindow units consisting of windowsdoor units consisting of doorsdoor and window frameswindow surroundsroller shutter surroundsexterior roller blind surroundsdoor surroundsfolding shutter surroundswindow elements being metal window sashesroller shutter elements being pulleyspulleys for exterior roller blinds for guiding lightdoor elements being door fittings of metalfolding shutter elements being folding shutter pulleysMetal profiles made of steelironnickeltitanium and other metals and their alloys for buildingsMetal profiles made of steelironnickeltitanium and other metals and their alloys for windowsMetal profiles made of steelironnickeltitanium and other metals and their alloys for roller shuttersMetal profiles made of steelironnickeltitanium and other metals and their alloys for exterior roller blindsMetal profiles made of steelironnickeltitanium and other metals and their alloys for doorsMetal profiles made of steelironnickeltitanium and other metals and their alloys for folding shuttersMetal joinery fittingswindow fittingsroller shutter fittingsexterior roller blind fittingsdoor fittingsfolding shutter fittingsReinforcing materials of metal for buildingbuilding construction materialsawnings; wall panelspartitions for building; rolling shutters for shops and conservatories; all the aforesaid goods made of metals

Class 19

Windowsbalcony windowsterrace windowsroller shuttersOutdoor roller blindsnot of metal and not of textiledoorsbalcony doorsterrace doorsfolding shutterswindowsillsgatesgarage doorswindow units consisting of windowsdoor and window frameswindow surroundsroller shutter surroundsOutdoor roller blind surroundsnot of metal and not of textiledoor surroundsfolding shutter surroundswindow sashesroller shutter sillssills for exterior roller blinds for guiding lightdoor fittingsfolding shutter sillsNon-metal weight-supporting corbels for building purposeswindow fittingsroller shutter fittingsroller blind fittingsdoor fittingsfolding shutter fittingsBuilding materialscomposite panels composed primarily of nonmetal materialsBuilding construction materialshardwood boards; wall panelspartitions for buildingrolling shutters for shops and conservatories; glass for building; insulating glass; Window glass for building; plate glass windows for building; hardened glass for building; drawn glass for building; Glazed ceramic tiles; all the aforesaid goods not made of metals

Publications

History of USPTO decisions and trademark events.

39 publications found

INTR

TOTAL INVALIDATION OF REG EXT PROTECTION CREATED

02/27/2026

C71T

CANCELLED SECTION 71

06/27/2025

REM3

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED

12/11/2023

RNWL

INTERNATIONAL REGISTRATION RENEWED

06/24/2022

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

05/31/2019

ADCH

CHANGE OF NAME/ADDRESS REC'D FROM IB

04/11/2019

XXSS

GENERIC MADRID TRANSACTION SENT TO IB

03/22/2019

XXCR

GENERIC MADRID TRANSACTION CREATED

03/22/2019

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

03/11/2019

R.PR

REGISTERED-PRINCIPAL REGISTER

12/11/2018

GPNX

NOTIFICATION PROCESSED BY IB

11/02/2018

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

09/25/2018

PUBO

PUBLISHED FOR OPPOSITION

09/25/2018

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

09/05/2018

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

09/05/2018

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

09/05/2018

ALIE

ASSIGNED TO LIE

08/23/2018

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

08/10/2018

XAEC

EXAMINER'S AMENDMENT ENTERED

08/08/2018

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

08/08/2018

GNEA

EXAMINERS AMENDMENT E-MAILED

08/08/2018

CNEA

EXAMINERS AMENDMENT -WRITTEN

08/08/2018

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

08/01/2018

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

07/31/2018

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

07/31/2018

RFNT

REFUSAL PROCESSED BY IB

02/23/2018

CRSN

CORRECTION SENT TO IB

02/06/2018

CRCR

CORRECTION CREATED FOR IB

02/06/2018

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

02/02/2018

RFRR

REFUSAL PROCESSED BY MPU

02/02/2018

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

01/26/2018

CNRT

NON-FINAL ACTION WRITTEN

01/25/2018

RFWR

NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW

01/25/2018

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

01/17/2018

CNRT

NON-FINAL ACTION WRITTEN

01/16/2018

DOCK

ASSIGNED TO EXAMINER

01/08/2018

MAFR

APPLICATION FILING RECEIPT MAILED

11/29/2017

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

11/25/2017

SDRC

SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB

11/16/2017

Continuous trademark protection

Get notified about every new filing that threatens WINERGETIC or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.