(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

DURASYSTEM

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

DURASYSTEM

ST13

US500000079204204

Class

6, 11, 19, 20

Filing

79204204

Registration

5388864

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

44

Latest update

11/01/2025

Trademark type

Word

Nice classes

6, 11, 19, 20

Filing date

11/09/2016

Registration date

01/30/2018

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

09/18/2024

Last transaction

11/01/2025

Responsible office

United States Patent and Trademark Office

Status code

707

Official register

Principal Register

Drawing code

4

Owner type

99

Owner location

Hornberg, DE

Examiner

TURNER, LAUREN

Current location

Historical data usage

Holders and representatives

Holders

D. A. (pessoa física)
D. A. (pessoa física)

Representatives

Kenneth F. Florek FLOREK & ENDRES PLLC

Technical classification

Nice Classes

Class 6Class 11Class 19Class 20

Vienna Codes

No Vienna codes available.

Goods and services

Class 6

Metal pipes; metal building materials for assembly of sanitary installations and not part of those installationsmetal framesmetal pipe collarsmetal caps for tubing ends and metal valves not being parts of machines or plumbing or heating and cooling installationsfor manually controlling the flow of pipelines

Class 11

Sanitary installationswash-hand basins and washstands; shelves for storage for wash-hand basins and washstandsparts thereofceramic bidetstoiletsurinalsbath tubsshower traysshower cubicles; taps and control fittings in the nature of shower control valves* tub control valves* faucets for water supply and sanitary installations; toilet seats; toilet cisterns; flushing apparatus for toilets; lavatory installations

Class 19

Non-metallic building materials for assembly of sanitary installationsplastic water tanksplastic door framesplastic filling valvesplastic flushing valvesfoam insulation material and water-pipe valvesnot of metal or plastic; rigid pipesnot of metal

Class 20

Mirrored cabinets for bathrooms and washrooms; goods of wood or wood substitute materials for bathrooms and washroomscurtain railswall hooksworks of art; goods of plasticsfittings for furniturewindows and doors for bathrooms and washrooms; fittingsnot of metalfor furniture and sanitary installations for bathrooms and washrooms in the nature of furniture for bathrooms and washrooms; wall hooksnot of metalfor bathrooms and washrooms; towel dispensersnot of metalfixed; bathroom furniture; bathroom mirrors

Publications

History of USPTO decisions and trademark events.

44 publications found

INNP

PARTIAL INVALIDATION PROCESSED BY THE IB

10/31/2025

INPS

PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB

09/20/2025

INPC

INVALIDATION PROCESSED

09/20/2025

INPR

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED

05/18/2025

NA71

NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED

09/18/2024

71.P

REGISTERED - PARTIAL SEC 71 ACCEPTED

09/18/2024

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

09/16/2024

ES71

TEAS SECTION 71 RECEIVED

12/21/2023

INNA

INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE

12/07/2018

INPR

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED

11/28/2018

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

06/15/2018

FICS

FINAL DISPOSITION NOTICE SENT TO IB

05/03/2018

FIMP

FINAL DISPOSITION PROCESSED

05/03/2018

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

04/30/2018

CORR

CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED

03/28/2018

COC.

CORRECTION UNDER SECTION 7 - PROCESSED

03/28/2018

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

03/28/2018

CRCV

CORRECTION TRANSACTION RECEIVED FROM IB

02/16/2018

R.PR

REGISTERED-PRINCIPAL REGISTER

01/30/2018

PUBO

PUBLISHED FOR OPPOSITION

11/14/2017

NPUB

NOTICE OF PUBLICATION

10/25/2017

RFNP

REFUSAL PROCESSED BY IB

10/13/2017

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

10/11/2017

ACEC

AMENDMENT FROM APPLICANT ENTERED

09/20/2017

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

09/20/2017

MAIL

PAPER RECEIVED

09/18/2017

CRSN

CORRECTION SENT TO IB

09/06/2017

CRCR

CORRECTION CREATED FOR IB

09/06/2017

CNRT

NON-FINAL ACTION MAILED

08/07/2017

CNRT

NON-FINAL ACTION WRITTEN

08/05/2017

ACEC

AMENDMENT FROM APPLICANT ENTERED

07/12/2017

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

07/12/2017

ALIE

ASSIGNED TO LIE

06/28/2017

MAIL

PAPER RECEIVED

05/30/2017

RFNT

REFUSAL PROCESSED BY IB

04/29/2017

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

04/10/2017

RFRR

REFUSAL PROCESSED BY MPU

04/10/2017

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

04/08/2017

CNRT

NON-FINAL ACTION WRITTEN

04/07/2017

MAFR

APPLICATION FILING RECEIPT MAILED

04/07/2017

DOCK

ASSIGNED TO EXAMINER

04/03/2017

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

04/03/2017

LIMI

LIMITATION FROM ORIGINAL APPLICATION ENTERED

03/31/2017

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

03/30/2017

Continuous trademark protection

Get notified about every new filing that threatens DURASYSTEM or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.