(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

MM&KENZAI

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

MM&KENZAI

ST13

US500000079203619

Class

6, 19, 37

Filing

79203619

Registration

5268577

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

35

Latest update

02/20/2026

Trademark type

Word

Nice classes

6, 19, 37

Filing date

07/07/2016

Registration date

08/22/2017

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

04/11/2024

Last transaction

02/20/2026

Responsible office

United States Patent and Trademark Office

Status code

708

Official register

Principal Register

Drawing code

4

Owner type

03

Owner location

Tokyo, JP

Examiner

STEDMAN, CORI

Law office

N50

Holders and representatives

Holders

MM&KENZAI Corporation
MM&KENZAI Corporation

Representatives

Michelle P. Ciotola Cantor Colburn LLP

Technical classification

Nice Classes

Class 6Class 19Class 37

Vienna Codes

No Vienna codes available.

Goods and services

Class 6

Irons and steels; non-ferrous metals and their alloys; alloys of ironsiliconcarbon used in the steel manufacturing process and casting processferro-silicon; alloys of iron and manganese used in the steel manufacturing process and casting processferro-manganese; alloys of silicon and manganese used in the steel manufacturing process and casting processsilico-manganese; metal reinforcement materials for building or construction; metal materials for building or constructionmetal handrail decorations for building in the nature of grab rails and metal pillar decoration for building in the nature of stanchion posts; prefabricated metal building assembly kits; metal moulds for forming cement products in the nature of cement posts for buildingroad constructionbridge constructionpark construction; metal hardwarenutspulleysspringswashersexpansion joints for floorswallspiping and ductingpipe jointsstructural joint connectors and bolts; wire nets and gauzes; joinery fittings of metal; safe deposit boxes

Class 19

Non-metallic minerals for building; non-metallic minerals for construction; ceramic building materialsceramic floor tiles and ceramic drain pipes; building materials made of linoleum in the nature of veneer for use on existing walls or floors; plastic building materialssoffits and fascia; synthetic building materialssoffits and fascia; asphalt; asphalt building materialsasphalt roofing paper and asphalt roofing felt; asphalt construction materialsasphalt roofing paper and asphalt roofing felt; rubber building materialsrubber floor tiles and rubber seismic control damper for building in the nature of rubber bearings that minimize forces and displacements experienced by buildings during an earthquake; rubber construction materialsrubber floor tiles and rubber seismic control damper for construction in the nature of rubber bearings that minimize forces and displacements experienced by buildings during an earthquake; plaster for building purposes; lime building materials; lime construction materialshydrated lime for building purposes; building materials of plasterplaster boards; construction materials of plasterplaster boards; construction materials in the nature of rockslide retention nets of textiles; prefabricated non-metal buildingssold in kit form; resin concrete productspipes and floors; cement and its productscement slabs and cement pipes; building timber; building stone

Class 37

Construction of buildings and other structuresharbor structures in the nature of dockspiers and wharfspublic work structures in the nature of toll collection structures and steel-reinforced bridgestruss bridgecable stayed bridgesuspension bridgearch bridgerigid frame bridge and girder bridgestructures at airports in the nature of hangersterminal building for passengers and control towers; provision of construction advice; rental of construction machines and apparatus

Publications

History of USPTO decisions and trademark events.

35 publications found

RNWL

INTERNATIONAL REGISTRATION RENEWED

02/19/2026

INNP

PARTIAL INVALIDATION PROCESSED BY THE IB

02/28/2025

INNA

INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE

02/06/2025

INPS

PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB

02/05/2025

INPC

INVALIDATION PROCESSED

02/05/2025

INPR

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED

12/12/2024

INPR

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED

12/11/2024

NA75

NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED

04/11/2024

C75P

REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.

04/11/2024

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

04/08/2024

ES75

TEAS SECTION 71 & 15 RECEIVED

07/31/2023

REM3

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED

08/22/2022

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

12/29/2017

FICS

FINAL DISPOSITION NOTICE SENT TO IB

12/08/2017

FIMP

FINAL DISPOSITION PROCESSED

12/08/2017

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

11/22/2017

R.PR

REGISTERED-PRINCIPAL REGISTER

08/22/2017

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

06/06/2017

PUBO

PUBLISHED FOR OPPOSITION

06/06/2017

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

05/17/2017

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

05/01/2017

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

04/27/2017

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

04/26/2017

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

04/26/2017

RFNT

REFUSAL PROCESSED BY IB

04/22/2017

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

04/21/2017

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

04/21/2017

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

04/05/2017

RFRR

REFUSAL PROCESSED BY MPU

04/05/2017

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

04/04/2017

CNRT

NON-FINAL ACTION WRITTEN

04/03/2017

MAFR

APPLICATION FILING RECEIPT MAILED

03/28/2017

DOCK

ASSIGNED TO EXAMINER

03/24/2017

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

03/24/2017

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

03/23/2017

Continuous trademark protection

Get notified about every new filing that threatens MM&KENZAI or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.