(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

6M

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

6M

ST13

US500000079201937

Class

7, 9, 35, 37, 38, 42

Filing

79201937

Registration

5494428

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

42

Latest update

03/06/2026

Trademark type

Word

Nice classes

7, 9, 35, 37, 38, 42

Filing date

07/20/2016

Registration date

06/19/2018

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

01/03/2025

Last transaction

03/06/2026

Responsible office

United States Patent and Trademark Office

Status code

709

Official register

Principal Register

Drawing code

4

Owner type

99

Owner location

DE

Examiner

BUONGIORNO, CHRISTOPHER L

Law office

L20

Current location

PUBLICATION AND ISSUE SECTION

Holders and representatives

Holders

SENVION GmbH

Representatives

Timothy J. Lyden Hogan Lovells US LLP

Technical classification

Nice Classes

Class 7Class 9Class 35Class 37Class 38Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 7

Machines for generating and converting energy and installations constructed therefromwind power plantswind turbines; parts and fittings for wind power plantsrotor bladesrotorsrotor consolestowersmastsblade hubsbearing housings for wind turbinesrotation devicesyaw ringsyaw gearsrotor adjustersdevices for setting the pitch of the bladesbrakes and brake equipmentmain drive shaftsuniversal jointsgearsgear boxescouplings and electric generators

Class 9

electrical and electronic voltage and current regulators for wind power plants and wind farms; electrical and electronic regulatingcheckingsupervisioncontrol and monitoring apparatus and instruments for wind power plants and wind farmsmeter sensors for measuring turbine performance and power generation in wind power plantsfor recordingprocessingstorage and transmission of data from wind power plants and wind farms; switch cabinets specifically adapted for wind power plants for controlling actuator systems for wind power plants and wind farms; wind turbine controllers; computer software for operatingmonitoringregulating wind power plants and wind farmsfor calculating the dimensions of wind farms and the surrounding landas well as calculating their efficiencyfor calculating the dimensions of rotors used on wind mills in wind farms

Class 35

Economic forecasting and analysis with regard to wind power plants and wind farms

Class 37

Erectionconstructioninstallationmaintenancerepair of wind power plants; conducting maintenance and repair work for interference elimination in wind power plants and wind farms

Class 38

Telecommunicationstransmission of data between and among wind power plants and wind farms

Class 42

Remote monitoring of wind power plants and wind farms for the supervision and monitoring thereof via the Internet; remote maintenance of computer software for the control and monitoring of wind power plants and wind farms; electronic storage of data with regard to wind power plants and wind farms; analysis of technical data regarding the performance and operation of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; technical supportproviding 24/7 service desk or help desk services for IT infrastructure and operating systems for wind power plant projects; testing of wind power plantswind farms and components therefor for technical malfunction; scientific and technological research relating to wind power plants and wind farms; providing technical information about the development of wind power plants and wind farms via data networksin particularvia the Internet; and technical consultancy with regard to computer software in the field of wind power plants and wind farm

Publications

History of USPTO decisions and trademark events.

42 publications found

INNT

TOTAL INVALIDATION PROCESSED BY THE IB

03/05/2026

INTS

TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB

02/14/2026

INPC

INVALIDATION PROCESSED

02/14/2026

INTR

TOTAL INVALIDATION OF REG EXT PROTECTION CREATED

09/10/2025

INTR

TOTAL INVALIDATION OF REG EXT PROTECTION CREATED

09/03/2025

C71T

CANCELLED SECTION 71

01/03/2025

REM3

COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED

06/19/2023

NREP

NEW REPRESENTATIVE AT IB RECEIVED

05/21/2022

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

10/12/2018

FICS

FINAL DISPOSITION NOTICE SENT TO IB

09/21/2018

FIMP

FINAL DISPOSITION PROCESSED

09/21/2018

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

09/19/2018

R.PR

REGISTERED-PRINCIPAL REGISTER

06/19/2018

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

04/03/2018

PUBO

PUBLISHED FOR OPPOSITION

04/03/2018

GPNX

NOTIFICATION PROCESSED BY IB

03/30/2018

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

03/14/2018

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

03/14/2018

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

03/14/2018

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

02/26/2018

XAEC

EXAMINER'S AMENDMENT ENTERED

02/26/2018

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

02/26/2018

GNEA

EXAMINERS AMENDMENT E-MAILED

02/26/2018

CNEA

EXAMINERS AMENDMENT -WRITTEN

02/26/2018

GNFN

NOTIFICATION OF FINAL REFUSAL EMAILED

09/27/2017

GNFR

FINAL REFUSAL E-MAILED

09/27/2017

CNFR

FINAL REFUSAL WRITTEN

09/27/2017

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

09/08/2017

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

09/08/2017

ALIE

ASSIGNED TO LIE

09/06/2017

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

08/24/2017

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

05/08/2017

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

05/08/2017

RFNT

REFUSAL PROCESSED BY IB

03/25/2017

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

03/07/2017

RFRR

REFUSAL PROCESSED BY MPU

03/07/2017

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

03/04/2017

CNRT

NON-FINAL ACTION WRITTEN

03/03/2017

MAFR

APPLICATION FILING RECEIPT MAILED

02/28/2017

DOCK

ASSIGNED TO EXAMINER

02/24/2017

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

02/24/2017

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

02/23/2017

Continuous trademark protection

Get notified about every new filing that threatens 6M or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.