(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

INTENERGY

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

INTENERGY

ST13

US500000079194541

Class

9, 11, 19

Filing

79194541

Registration

5278831

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

34

Latest update

05/15/2026

Trademark type

Combined

Nice classes

9, 11, 19

Filing date

04/20/2016

Registration date

09/05/2017

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

04/23/2024

Last transaction

05/15/2026

Responsible office

United States Patent and Trademark Office

Status code

707

Official register

Principal Register

Drawing code

5

Owner type

99

Owner location

Taizhou City, Zhejiang Province (1F-41), CN

Examiner

PARK, JENNY K

Law office

L40

Mark description

The mark consists of stylized letters "INTENERGY".

Holders and representatives

Holders

Z. T. (pessoa física)
PERLIGHT SOLAR CO., LTD.

Representatives

Prakash NAMA

Technical classification

Nice Classes

Class 9Class 11Class 19

Vienna Codes

No Vienna codes available.

Goods and services

Class 9

Electricity distribution consoles; electrical distribution boxes; electricity cell switches; electricity inverters; integrated circuits chips; silicon epitaxial slicesilicon epitaxial wafers; polycrystalline siliconpolycrystalline silicon chips; semiconductor devicesemiconductor devices used to provide a fixed voltage drop over a wide range of current; electricity junction boxes; monocrystalline siliconmonocrystalline silicon chips; distribution device for high voltage explosion protectioncircuit overload protector device; power station automatization installationtransformers; lightning arresters; chargers for electric batteries; galvanic cells; electric accumulators; solar batteries

Class 11

Lighting apparatus for vehicles; lighting apparatus and installations; gas lightersutility lighters for lighting grillsfireplaces and candles; electric cooking utensilsbaking ovens; solar furnaces; air conditioning installations; solar collectors for heating; solar water heater; heaters for baths; pocket warmersnon-electric chemicallyactivated heating packets for warming hands

Class 19

Gypsum board; concrete building elementsconcrete blocksbrickspostsslabs and panels; refractory construction materialsnot of metal; floorsnot of metal; building materialsnot of metalwallhardwooddeckingwoodparticle boards; illuminant paving blocksnot of metal; roofingnot of metalincorporating solar cells; prefabricated buildingsnot of metal; building glass; building materialscoatings of tar coatings for use on roofswalls and pavement

Publications

History of USPTO decisions and trademark events.

34 publications found

RNWL

INTERNATIONAL REGISTRATION RENEWED

05/14/2026

INNP

PARTIAL INVALIDATION PROCESSED BY THE IB

04/19/2025

INNA

INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE

03/01/2025

XXSS

GENERIC MADRID TRANSACTION SENT TO IB

02/27/2025

XXCR

GENERIC MADRID TRANSACTION CREATED

02/26/2025

INPR

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED

12/24/2024

INPR

PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED

12/23/2024

NA71

NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED

04/23/2024

71.P

REGISTERED - PARTIAL SEC 71 ACCEPTED

04/23/2024

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

04/23/2024

ES71

TEAS SECTION 71 RECEIVED

08/29/2023

CHLD

CHANGE OF OWNER RECEIVED FROM IB

05/28/2021

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

01/26/2018

FICS

FINAL DISPOSITION NOTICE SENT TO IB

12/16/2017

FIMP

FINAL DISPOSITION PROCESSED

12/15/2017

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

12/05/2017

CORR

CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED

10/17/2017

CRCV

CORRECTION TRANSACTION RECEIVED FROM IB

10/13/2017

R.PR

REGISTERED-PRINCIPAL REGISTER

09/05/2017

PUBO

PUBLISHED FOR OPPOSITION

06/20/2017

NPUB

NOTICE OF PUBLICATION

05/31/2017

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

05/10/2017

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

05/09/2017

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

05/08/2017

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

05/08/2017

RFNT

REFUSAL PROCESSED BY IB

11/25/2016

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

11/10/2016

RFRR

REFUSAL PROCESSED BY MPU

11/10/2016

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

11/08/2016

CNRT

NON-FINAL ACTION WRITTEN

11/07/2016

MAFR

APPLICATION FILING RECEIPT MAILED

11/04/2016

DOCK

ASSIGNED TO EXAMINER

10/31/2016

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

10/31/2016

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

10/27/2016

Continuous trademark protection

Get notified about every new filing that threatens INTENERGY or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.