(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

D

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: CombinedOffice: United States

Quick snapshot

D

ST13

US500000078973613

Class

42

Filing

78973613

Registration

3370920

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

31

Latest update

01/08/2018

Trademark type

Combined

Nice classes

42

Filing date

09/13/2006

Registration date

01/15/2008

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

01/08/2018

Last transaction

01/08/2018

Responsible office

United States Patent and Trademark Office

Status code

800

Official register

Principal Register

Filing basis

Intent to use

First use anywhere

01/24/2007

First use in commerce

01/24/2007

Drawing code

3

Owner type

03

Owner location

Phoenix, AZ, US

Examiner

BUTLER, ANDREA P

Law office

L20

Current location

GENERIC WEB UPDATE

Mark description

The mark consists of the letter D in a shaded circle.

Holders and representatives

Holders

Dibble & Associates Consulting Engineers

Representatives

Jennifer A. Van Kirk Lewis Roca Rothgerber Christie LLP

Technical classification

Nice Classes

Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 42

Civil engineering and infrastructure planning services; Airport infrastructure servicesnamely location studiesairport master planningconstruction administration and inspectiondesign and construction surveys and design of runwaystaxiwaysparking apronst-hangarsgradingpavement rehabilitationdrainagedetention basinsstreet systemsparking facilitiesutilitiesfencing and security/access control systemsfuel storagesite infrastructure for airport terminals and building facilitiesDrainage and flood control engineering servicesnamely design of detention/retention basinsopen channelsriver worksstorm drainsdrop structuresenergy dissipatorsspillwaysculvertsscour and bank protectiondams; Drainage and flood control engineering servicesnamely area drainage master studies and planspreliminary designadministration and inspectiondesign and construction surveysflood insurance studiesdrainage manuals404 permits/401 certificationfloodplain delineationsFEMA CLOMR/LOMRbridge scour analysishydrologic and hydraulic modeling and analysissediment transporterosion and degradation studiestwo-dimensional modeling and benefit-cost analysisinundation studiesemergency action plans (EAP)flood damage and risk assessmentdambreak modeling and flood hazard mappingfloodplain delineation and mappingstream navigabilityerosion setback evaluation and mapping; Site infrastructure engineering servicesnamely fire protection supplygas servicesgrading and drainagemaster planningwater/sewer system modelingmunicipal coordination/permitsNPDES/stormwater permitsoff site improvementsretention/detentiontraffic analysisundergroundat-grade and elevated parking and water/sewer services; Engineering survey servicesnamely control surveysthree dimensional imagingtopographic surveysboundary surveysright-of-way/easement surveysglobal positioning surveysphotogrammetry control surveysALTA/ACSM surveysconstruction stakingas-built surveys; Geographic information system servicesnamely asset inventory and management involving water and wastewaterstorm drainagewater distributiongas pipeline systemsdata collection and conversionstreet centerlinesdatabase designdevelopmentmanagementVB/VBA programming and avenue scriptingweb developmentdata deploymentmaintenancemanagementintegration of water distribution systems into GISintegration of sanitary sewer systems into GISintegration of storm drainage systems into GISfire hazard evaluation and mapping; Transportation engineering servicesnamely major street designhighway location studieshighway design concept reportshighway/freeway designstreet systemssidewalk improvementsroadway signing/striping designtraffic impact analysistraffic interchange designtraffic control plansdrainage analysis and designright-of-way analysis and planslegal descriptions and exhibitsutility design and relocationsconstruction administration/inspectionquality assurance/quality controlconstructability reviewscomprehensive project managementpartnering/teamwork leadershippublic involvementagency coordinationEnglish and metric capabilitiesparks and trailsutility and agency coordination; Water resource engineering servicesnamely transmission/distribution main designbooster pump station designreservoir designwell designpipeline rehabilitationwater system appraisalswater and sewer master planningsanitary sewer main designlift station designeffluent reuse/reclaimed pipelineswater/waste water treatmentirrigation delivery systemsgas pipeline designinfrastructure rehabilitationagency coordinationphased implementation planning and public involvement programs

Publications

History of USPTO decisions and trademark events.

31 publications found

NA89

NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED

01/08/2018

RNL1

REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)

01/08/2018

89AG

REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED

01/08/2018

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

01/08/2018

E89R

TEAS SECTION 8 & 9 RECEIVED

12/08/2017

REM2

COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED

01/15/2017

NA85

NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED

10/10/2013

C15A

REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.

10/10/2013

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

10/10/2013

815F

REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED

10/03/2013

E815

TEAS SECTION 8 & 15 RECEIVED

10/03/2013

R.PR

REGISTERED-PRINCIPAL REGISTER

01/15/2008

REGV

LAW OFFICE REGISTRATION REVIEW COMPLETED

12/12/2007

CNPR

ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED

11/27/2007

SUPC

STATEMENT OF USE PROCESSING COMPLETE

11/13/2007

IUAF

USE AMENDMENT FILED

10/30/2007

EISU

TEAS STATEMENT OF USE RECEIVED

10/30/2007

NOAM

NOA MAILED - SOU REQUIRED FROM APPLICANT

08/21/2007

PUBO

PUBLISHED FOR OPPOSITION

05/29/2007

NPUB

NOTICE OF PUBLICATION

05/09/2007

PREV

LAW OFFICE PUBLICATION REVIEW COMPLETED

03/28/2007

ALIE

ASSIGNED TO LIE

03/23/2007

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

02/27/2007

XAEC

EXAMINER'S AMENDMENT ENTERED

02/26/2007

GNEA

EXAMINERS AMENDMENT E-MAILED

02/26/2007

CNEA

EXAMINERS AMENDMENT -WRITTEN

02/26/2007

GNRT

NON-FINAL ACTION E-MAILED

02/09/2007

CNRT

NON-FINAL ACTION WRITTEN

02/09/2007

DOCK

ASSIGNED TO EXAMINER

02/05/2007

MDSM

NOTICE OF DESIGN SEARCH CODE MAILED

09/20/2006

NWAP

NEW APPLICATION ENTERED

09/19/2006

Continuous trademark protection

Get notified about every new filing that threatens D or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.