(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

KTA-TATOR

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

KTA-TATOR

ST13

US500000078365248

Class

37, 42, 45

Filing

78365248

Registration

3204962

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

60

Latest update

02/07/2026

Trademark type

Word

Nice classes

37, 42, 45

Filing date

02/10/2004

Registration date

02/06/2007

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

07/06/2016

Last transaction

02/07/2026

Responsible office

United States Patent and Trademark Office

Status code

800

Official register

Principal Register

First use anywhere

01/01/1976

First use in commerce

01/01/1976

Drawing code

4

Owner type

03

Owner location

Pittsburgh, PA

Examiner

REGAN, JOHN B

Law office

M40

Current location

GENERIC WEB UPDATE

Holders and representatives

Holders

KTA-Tator, Inc.

Representatives

Mark Andrew Mazza Dentons Cohen & Grigsby P.C.

Technical classification

Nice Classes

Class 37Class 42Class 45

Vienna Codes

No Vienna codes available.

Goods and services

Class 37

technical construction-related consultation in the fields of paintcoatings and liningserection and rehabilitation of mechanical equipmentnamely cranesmetal and concrete structuresnamely bridgesdockspierswater tanksthat are subject to hostile environments; inspection in the course of construction of structuresnamely bridgesdockspiers and water tanksthat are subject to hostile environments; technical construction supervision and construction inspection in the fields of paintcoatings and linings applicationnamely inspection during pre-construction steel fabrication to ensure compliance with weld standardsinspection during erection and rehabilitation to ensure compliance with construction standardssupervision of air barrier installation to ensure compliance with safety design standards

Class 42

technical consultation in the fields of protection of the environment from construction debris and installation of air barrier technologies; inspection in the course of construction of equipmentnamely cranesthat are subject to hostile environments; oversight during construction to ensure compliance with environmental requirements; inspection in the fields of paintcoatings and linings applicationnamely inspection during erection and rehabilitation to ensure compliance with construction standardssupervision of air barrier installation to ensure compliance with environmental standards; engineering services; technical consultation in the field of environmental protectionnamely reviewing standards and practices to assure compliance with environmental laws and regulations; inspection services in the field of equipment; technology supervision and inspection in the fields of paintcoatings and linings application; chemical and mechanical laboratory services; laboratory research in the fields of paint/coatings linings analysisadvanced analytical and physical testing of materials performanceenvironmental testing

Class 45

consultation services in the field of the safety needs of commercial and industrial companies

Publications

History of USPTO decisions and trademark events.

60 publications found

REM2

COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED

02/06/2026

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

01/18/2024

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

01/18/2024

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

01/18/2024

CHAN

APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED

01/18/2024

COAR

TEAS CHANGE OF OWNER ADDRESS RECEIVED

01/18/2024

NA89

NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED

07/06/2016

RNL1

REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)

07/06/2016

89AG

REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED

07/06/2016

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

07/06/2016

MAIL

PAPER RECEIVED

04/15/2016

E89R

TEAS SECTION 8 & 9 RECEIVED

02/09/2016

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

02/09/2016

REM2

COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED

02/06/2016

NAS8

NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED

04/11/2012

8.OK

REGISTERED - SEC. 8 (6-YR) ACCEPTED

04/11/2012

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

04/11/2012

ES8R

TEAS SECTION 8 RECEIVED

03/22/2012

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

03/22/2012

R.PR

REGISTERED-PRINCIPAL REGISTER

02/06/2007

PUBO

PUBLISHED FOR OPPOSITION

11/21/2006

NPUB

NOTICE OF PUBLICATION

11/01/2006

PREV

LAW OFFICE PUBLICATION REVIEW COMPLETED

09/28/2006

ALIE

ASSIGNED TO LIE

09/18/2006

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

09/03/2006

XAEC

EXAMINER'S AMENDMENT ENTERED

09/01/2006

GNEA

EXAMINERS AMENDMENT E-MAILED

09/01/2006

CNEA

EXAMINERS AMENDMENT -WRITTEN

09/01/2006

ZZZX

PREVIOUS ALLOWANCE COUNT WITHDRAWN

08/31/2006

PBCR

WITHDRAWN FROM PUB - OG REVIEW QUERY

08/26/2006

PREV

LAW OFFICE PUBLICATION REVIEW COMPLETED

07/21/2006

ALIE

ASSIGNED TO LIE

07/19/2006

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

06/27/2006

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

06/15/2006

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

06/08/2006

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

06/08/2006

GNRT

NON-FINAL ACTION E-MAILED

01/07/2006

CNRT

NON-FINAL ACTION WRITTEN

01/07/2006

GNFR

FINAL REFUSAL E-MAILED

01/07/2006

CNFR

FINAL REFUSAL WRITTEN

01/07/2006

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

12/22/2005

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

12/09/2005

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

12/09/2005

GRML

CORRESPONDENCE E-MAILED

10/13/2005

CPEA

EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED

10/13/2005

PETG

PETITION TO REVIVE-GRANTED

09/29/2005

PETL

COMMUNICATION RECEIVED FROM PETITIONER

09/22/2005

MAIL

PAPER RECEIVED

09/22/2005

PINM

INCOMPLETE PETITION NOTICE MAILED

09/15/2005

PETL

COMMUNICATION RECEIVED FROM PETITIONER

08/30/2005

MAIL

PAPER RECEIVED

08/30/2005

PINM

INCOMPLETE PETITION NOTICE MAILED

08/04/2005

PETR

PETITION TO REVIVE-RECEIVED

05/05/2005

FAXX

FAX RECEIVED

05/05/2005

MAB2

ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND

04/18/2005

ABN2

ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE

04/16/2005

GNRT

NON-FINAL ACTION E-MAILED

09/13/2004

CNRT

NON-FINAL ACTION WRITTEN

09/13/2004

DOCK

ASSIGNED TO EXAMINER

09/02/2004

NWAP

NEW APPLICATION ENTERED

02/22/2004

Continuous trademark protection

Get notified about every new filing that threatens KTA-TATOR or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.