(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

FUTURE PIPE

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: United States

Quick snapshot

FUTURE PIPE

ST13

US500000078211847

Class

17, 19, 40, 42

Filing

78211847

Registration

5853693

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

83

Latest update

01/24/2026

Trademark type

Word

Nice classes

17, 19, 40, 42

Filing date

02/06/2003

Registration date

09/10/2019

Expiration date

-

Complete case details

Structured fields from the responsible authority and the official record.

Status date

01/23/2026

Last transaction

01/24/2026

Responsible office

United States Patent and Trademark Office

Status code

701

Official register

Principal Register

Filing basis

Foreign priority

First use anywhere

1991-00-00

First use in commerce

1991-00-00

Drawing code

4

Owner type

03

Owner location

Dubai, AE

Examiner

SPRUILL, DARRYL M

Current location

Historical data usage

Holders and representatives

Holders

Future Pipe Industries Limited
Future Management Holdings SA

Representatives

Carol M. Wilhelm GRAY REED & MCGRAW LLP

Technical classification

Nice Classes

Class 17Class 19Class 40Class 42

Vienna Codes

No Vienna codes available.

Goods and services

Class 17

Flexible and rigid pipesnot of metal; composite non-metal pipe collars; composite non-metal pipe couplings and joints; composite non-metal seals for joining and terminating pipes; composite non-metal tubing and tubing couplings for joining and terminating pipes; pipe gaskets; pipe jacketsnot of metal for composite non-metal pipes; extruded plastic in the form of tubes for use in manufacturing; plastic tubes for chemical and industrial applications; plumbing pipes of plastic; flexible pipespipe couplingspipe partsgaskets and collars; pipe systems comprised of composite non-metal pipes for conveying fluids and gas; and spools for composite non-metal pipes for civil water and sewer useoil and gas conveyanceother chemical and industrial applications; fiberglasscompositerubber tubesplastic in the form of tubes; tube-fittings; tube systems comprised of composite non-metal tubes for conveying fluids and gas; all of the aforementioned made of fiberglassplasticpolyvinylchloride (pvc)polyethyleneused for civil water and sewer useoil and gas conveyanceother chemical and industrial applications

Class 19

RIGID PIPES NOT OF METAL ; NON-METALLIC RIGID PIPES MADE OF CONCRETE

Class 40

CUSTOM MANUFACTURE OF PIPESPIPE-FITTINGSPIPE COUPLINGSPIPE PARTSPIPE SYSTEMSSPOOLS FOR PIPES MADE OF FIBERGLASSPLASTICPOLYVINYLCHLORIDE (PVC)POLYETHYLENECONCRETE TO THE ORDER AND SPECIFICATION OF OTHERS; CUSTOM MANUFACTURE OF TANKSTANK-FITTINGSTANK SYSTEMS MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE TO THE ORDER AND SPECIFICATION OF OTHERS; CUSTOM MANUFACTURE OF TUBESTUBE-FITTINGSTUBE SYSTEMS MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE TO THE ORDER AND SPECIFICATION OF OTHERS; CUSTOM MANUFACTURE OF NON-METALLIC GOODSNAMELY PIPESTANKSTUBESFITTINGSCOUPLINGSPIPE PARTSPIPE SYSTEMSSPOOLS FOR PIPES MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE TO THE ORDER AND SPECIFICATION OF OTHERS; CUSTOM MANUFACTURE OF NON-METALLIC-REINFORCED GOODSNAMELY PIPESTANKSTUBESFITTINGSCOUPLINGSPIPE PARTSPIPE SYSTEMSSPOOLS FOR PIPES MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE TO THE ORDER AND SPECIFICATION OF OTHERS USED FOR INDUSTRIAL APPLICATIONS

Class 42

DESIGN FOR OTHERS PIPESPIPE-FITTINGSPIPE COUPLINGSPIPE PARTSPIPE SYSTEMSSPOOLS FOR PIPES MADE OF FIBERGLASSPLASTICPOLYVINYLCHLORIDE (PVC)POLYETHYLENECONCRETE ; DESIGN FOR OTHERS TANKSTANK-FITTINGSTANK SYSTEMS MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE ; DESIGN FOR OTHERS TUBESTUBE-FITTINGSTUBE SYSTEMS MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE ; DESIGN FOR OTHERS NON-METALLIC GOODSNAMELY PIPESTANKSTUBESFITTINGSCOUPLINGSPIPE PARTSPIPE SYSTEMSSPOOLS FOR PIPES MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE ; DESIGN FOR OTHERS NON-METALLIC-REINFORCED GOODSNAMELY PIPESTANKS; TUBESFITTINGSCOUPLINGSPIPE PARTSPIPE SYSTEMSSPOOLS FOR PIPES MADE OF FIBERGLASSPLASTICPVCPOLYETHYLENECONCRETE USED FOR INDUSTRIAL APPLICATIONS

Publications

History of USPTO decisions and trademark events.

83 publications found

NAS8

NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED

01/23/2026

8.OK

REGISTERED - SEC. 8 (6-YR) ACCEPTED

01/23/2026

EROP

TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED

01/22/2026

PRA8

POST REGISTRATION ACTION MAILED - SEC. 8

01/17/2026

NAS8

NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED

01/14/2026

XXXX

POST REGISTRATION ACTION CORRECTION

01/14/2026

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

01/13/2026

ES8R

TEAS SECTION 8 RECEIVED

09/05/2025

REM1

COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED

09/10/2024

COC.

CORRECTION UNDER SECTION 7 - PROCESSED

05/18/2020

EROP

TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED

05/15/2020

PRAM

POST REGISTRATION ACTION MAILED - SEC. 7

12/23/2019

EROP

TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED

12/17/2019

PRAM

POST REGISTRATION ACTION MAILED - SEC. 7

12/16/2019

APRE

CASE ASSIGNED TO POST REGISTRATION PARALEGAL

12/10/2019

ES7R

TEAS SECTION 7 REQUEST RECEIVED

11/07/2019

R.PR

REGISTERED-PRINCIPAL REGISTER

09/10/2019

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

06/25/2019

PUBO

PUBLISHED FOR OPPOSITION

06/25/2019

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

06/05/2019

PBCR

WITHDRAWN FROM PUB - OG REVIEW QUERY

04/23/2019

FIXD

ELECTRONIC RECORD REVIEW COMPLETE

04/10/2019

ERRR

ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED

04/05/2019

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

03/26/2019

XAEC

EXAMINER'S AMENDMENT ENTERED

03/26/2019

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

03/26/2019

GNEA

EXAMINERS AMENDMENT E-MAILED

03/26/2019

CNEA

EXAMINERS AMENDMENT -WRITTEN

03/26/2019

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

03/25/2019

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

03/25/2019

ERSI

TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED

03/20/2019

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

01/07/2019

GNS3

NOTIFICATION OF LETTER OF SUSPENSION E-MAILED

06/18/2018

GNSL

LETTER OF SUSPENSION E-MAILED

06/18/2018

CNSL

SUSPENSION LETTER WRITTEN

06/18/2018

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

05/18/2018

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

05/17/2018

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

05/17/2018

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

01/18/2018

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

01/18/2018

GNRN

NOTIFICATION OF NON-FINAL ACTION E-MAILED

12/10/2017

GNRT

NON-FINAL ACTION E-MAILED

12/10/2017

CNRT

NON-FINAL ACTION WRITTEN

12/10/2017

RCCK

SUSPENSION CHECKED - TO ATTORNEY FOR ACTION

11/14/2017

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

05/10/2017

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

11/10/2016

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

05/09/2016

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

11/09/2015

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

05/04/2015

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

02/08/2015

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

11/03/2014

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

05/01/2014

RCCK

SUSPENSION CHECKED - TO ATTORNEY FOR ACTION

04/07/2014

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

10/01/2013

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

04/01/2013

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

10/01/2012

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

05/07/2012

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

03/28/2012

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

09/28/2011

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

03/28/2011

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

09/14/2010

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

03/11/2010

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

09/10/2009

ASCK

ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY

04/22/2009

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

03/05/2009

ASCK

ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY

02/04/2009

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

12/05/2008

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

09/04/2008

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

03/04/2008

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

09/04/2007

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

01/30/2007

ALIE

ASSIGNED TO LIE

01/30/2007

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

07/14/2006

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

12/10/2005

CNSL

LETTER OF SUSPENSION MAILED

06/01/2005

CNSL

SUSPENSION LETTER WRITTEN

05/31/2005

RCSC

REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

11/29/2004

CNSL

LETTER OF SUSPENSION MAILED

05/26/2004

MAIL

PAPER RECEIVED

01/23/2004

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

01/20/2004

CNRT

NON-FINAL ACTION MAILED

08/08/2003

DOCK

ASSIGNED TO EXAMINER

08/03/2003

MAIL

PAPER RECEIVED

06/05/2003

Continuous trademark protection

Get notified about every new filing that threatens FUTURE PIPE or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.