TrademarkIQ iconTrademarkIQ
Back to search
Official data from USPTO

ZEG CLIMATE+

Did you know this trademark is already registered in United States?

Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.

Active USPTO registrationType: WordOffice: US

Quick snapshot

ZEG CLIMATE+

ST13

US500000079313376

Class

1, 4, 7, 37, 40

Filing

79313376

Registration

6920108

Risk and opportunity diagnosis

Executive reading for naming, filing, and monitoring decisions.

Attention: there is active risk

USPTO status

Active USPTO registration

Case type

Application and registration

Recorded events

40

Latest update

04/24/2023

Classification

Registered

Trademark type

Word

Nice classes

1, 4, 7, 37, 40

Filing date

05/12/2021

Registration date

12/13/2022

Expiration date

-

Recommended action

Perform a full collision analysis and validate classes before any filing or trademark investment.

Next step

These are the details of the registration process. Even so, constant monitoring is what ensures peace of mind that your main asset remains protected.

Complete case details

Structured fields from the responsible authority and the official record.

Status date

12/13/2022

Last transaction

12/13/2022

Responsible office

United States Patent and Trademark Office

Status code

700

Official register

Principal Register

Drawing code

4

Owner type

99

Owner location

NO

Examiner

SAUNDERS, ANDREA

Law office

M80

Current location

PUBLICATION AND ISSUE SECTION

Holders and representatives

Holders

Z. A. (pessoa física)

Representatives

Sheldon H. Klein Lathrop GPM LLP

Technical classification

Nice Classes

Class 1Class 4Class 7Class 37Class 40

Vienna Codes

No Vienna codes available.

Goods and services

Class 1

Hydrogen; gas in solid form and dissolved form for fuel

Class 4

Electrical energy

Class 7

Hydrogen generators for generating electricity

Class 37

Construction of power plants; installation, maintenance and repair activities relating to hydropower, wind power, gas power plants; installation of electrical appliances; installation and repair of heaters and central heating appliances; operation of vehicle service stations; power plant construction; maintenance services of hydrogen vehicles; construction of incineration plants; operation and maintenance services of power plants; construction of gas power plants; construction activities relating to industrial complexes; general building contractor services in connection with dam, reservoir and hydraulic power stations; general building contractor services; installation, repair and maintenance of thermal, hydroelectric and nuclear installations

Class 40

Processing of fuel materials and substances, namely, processing of dry gas, natural gas and natural gas condensates; processing of petrochemical products; production of electric power and electricity from renewable sources; Production of electrical power from renewable sources for production of heat; waste incineration; production of electricity from renewable sources; production of heated water and energy; energy production services; gas purification; air purification; water treatment; destruction of trash and waste; incineration of waste and trash; hydrogen gas production; generation of gas and electricity; gas processing; refining of gas

Publications

History of USPTO decisions and trademark events.

40 publications found

FINO

FINAL DECISION TRANSACTION PROCESSED BY IB

04/24/2023

FICS

FINAL DISPOSITION NOTICE SENT TO IB

03/30/2023

FIMP

FINAL DISPOSITION PROCESSED

03/30/2023

FICR

FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB

03/13/2023

NRCC

NOTICE OF REGISTRATION CONFIRMATION EMAILED

12/13/2022

R.PR

REGISTERED-PRINCIPAL REGISTER

12/13/2022

OPNX

NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB

12/11/2022

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

11/23/2022

OPNR

NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB

11/23/2022

GPNX

NOTIFICATION PROCESSED BY IB

10/10/2022

NPUB

OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED

09/27/2022

PUBO

PUBLISHED FOR OPPOSITION

09/27/2022

OPNS

NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB

09/07/2022

OP2R

NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB

09/07/2022

NONP

NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED

09/07/2022

CNSA

APPROVED FOR PUB - PRINCIPAL REGISTER

08/22/2022

XAEC

EXAMINER'S AMENDMENT ENTERED

08/22/2022

GNEN

NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

08/22/2022

GNEA

EXAMINERS AMENDMENT E-MAILED

08/22/2022

CNEA

EXAMINERS AMENDMENT -WRITTEN

08/22/2022

CHAN

APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED

08/11/2022

TCCA

TEAS CHANGE OF CORRESPONDENCE RECEIVED

08/11/2022

ECDR

TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS

08/11/2022

ARAA

ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED

08/11/2022

REAP

TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED

08/11/2022

COAR

TEAS CHANGE OF OWNER ADDRESS RECEIVED

08/11/2022

DMCC

DATA MODIFICATION COMPLETED

08/03/2022

ALIE

ASSIGNED TO LIE

08/03/2022

TEME

TEAS/EMAIL CORRESPONDENCE ENTERED

08/02/2022

CRFA

CORRESPONDENCE RECEIVED IN LAW OFFICE

08/02/2022

TROA

TEAS RESPONSE TO OFFICE ACTION RECEIVED

08/02/2022

RFNT

REFUSAL PROCESSED BY IB

02/20/2022

RFCS

NON-FINAL ACTION MAILED - REFUSAL SENT TO IB

02/02/2022

RFRR

REFUSAL PROCESSED BY MPU

02/02/2022

RFCR

NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW

01/12/2022

CNRT

NON-FINAL ACTION WRITTEN

01/11/2022

DOCK

ASSIGNED TO EXAMINER

01/11/2022

MAFR

APPLICATION FILING RECEIPT MAILED

06/26/2021

NWOS

NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

06/22/2021

REPR

SN ASSIGNED FOR SECT 66A APPL FROM IB

06/17/2021

Continuous trademark protection

Get notified about every new filing that threatens ZEG CLIMATE+ or your mark.

Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.