NREP
NEW REPRESENTATIVE AT IB RECEIVED
10/21/2023
Did you know this trademark is already registered in United States?
Before investing in name, identity, and promotion, validate collision risk and registration strategy to avoid wasting time and budget.
Executive reading for naming, filing, and monitoring decisions.
USPTO status
Case type
Recorded events
Latest update
Classification
Trademark type
Nice classes
Filing date
Registration date
Expiration date
Recommended action
Perform a full collision analysis and validate classes before any filing or trademark investment.
Next step
These are the details of the registration process. Even so, constant monitoring is what ensures peace of mind that your main asset remains protected.
Structured fields from the responsible authority and the official record.
Status date
Last transaction
Responsible office
Status code
Official register
Drawing code
Owner type
Owner location
Examiner
Law office
Current location
Holders
Representatives
John H. Weber Baker & Hostetler LLP
Nice Classes
Vienna Codes
No Vienna codes available.
Goods and services
Class 7
[ Construction industry machines and machine tools and structural parts therefore for use in traffic area construction, airfield construction, railway construction, embankment dam construction, landfill construction, pipeline and channel construction, asphalt construction, earth-moving, hydraulic engineering, construction of tips, and mining and road demolition, namely, machines and machine tools and structural parts therefor for use in road repair, namely, crushers, road millers, road surface breakers, road finishers, asphalt finishers pavers, road topping recyclers, ground stabilizers, binding agent and grit spreaders; ] compactors and structural parts therefor for use with soil, asphalt and waste, namely, rollers [, tampers, and vibrating plates; machines, equipment and structural parts therefore for use in horizontal and vertical conveying of construction materials, namely, conveyor belts, slide conveyors, hoists and hydraulic lift tables ]
Class 9
Computer programs and software for documentation of soil compaction in the field of construction; computer programs to measure and control machines for soil compaction in the field of construction; devices for documentation of soil compaction in the field of the construction industry, namely, electronic instruments for measuring soil height and compaction
History of USPTO decisions and trademark events.
42 publications found
NEW REPRESENTATIVE AT IB RECEIVED
10/21/2023
PARTIAL INVALIDATION PROCESSED BY THE IB
06/13/2021
PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
05/12/2021
INVALIDATION PROCESSED
05/12/2021
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
09/08/2020
NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
01/08/2020
REGISTERED-SEC.71 ACCEPTED
01/08/2020
POST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED
01/08/2020
TEAS SECTION 71 & 15 RECEIVED
12/23/2019
COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
01/05/2019
INTERNATIONAL REGISTRATION RENEWED
10/05/2017
NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
04/28/2015
REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.
04/28/2015
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
04/28/2015
TEAS SECTION 71 & 15 RECEIVED
04/14/2015
NEW REPRESENTATIVE AT IB RECEIVED
10/06/2013
FINAL DECISION TRANSACTION PROCESSED BY IB
02/05/2013
FINAL DISPOSITION NOTICE SENT TO IB
05/07/2010
FINAL DISPOSITION PROCESSED
05/07/2010
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
04/05/2010
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
02/22/2010
REGISTERED-PRINCIPAL REGISTER
01/05/2010
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
10/20/2009
PUBLISHED FOR OPPOSITION
10/20/2009
LAW OFFICE PUBLICATION REVIEW COMPLETED
09/16/2009
ASSIGNED TO LIE
09/16/2009
APPROVED FOR PUB - PRINCIPAL REGISTER
09/08/2009
TEAS/EMAIL CORRESPONDENCE ENTERED
08/20/2009
CORRESPONDENCE RECEIVED IN LAW OFFICE
08/20/2009
TEAS RESPONSE TO OFFICE ACTION RECEIVED
08/20/2009
ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
06/29/2009
TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
06/29/2009
REFUSAL PROCESSED BY IB
04/30/2009
APPLICATION FILING RECEIPT MAILED
04/07/2009
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
04/06/2009
REFUSAL PROCESSED BY MPU
04/06/2009
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
04/05/2009
NON-FINAL ACTION WRITTEN
04/04/2009
ASSIGNED TO EXAMINER
04/03/2009
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
04/03/2009
LIMITATION OF GOODS/SERVICES FROM IB ENTERED
04/02/2009
SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB
04/02/2009
Continuous trademark protection
Professional 24-month watch service: we monitor USPTO for you and alert you in time to oppose — before conflicts become losses.