(11) 98705-3426
TrademarkIQ iconTrademarkIQ
Back to search
Official data from INPI

DISPOSIÇÃO CONSTRUTIVA INTRODUZIDA EM CRUZETA APLICADA A LINHA DE TRANSMISSÃO E DISTRIBUIÇÃO DE ENERGIA ELÉTRICA

Arquivada/ExtintaUtility Model

Application data

Number

MU8900217

Type

Utility Model

Filing

02/25/2009

Publication

10/19/2010

Progress at the INPI

  1. Filing02/25/09
  2. Publication10/19/10
  3. Abandoned
  4. Allowance
  5. Grant
  6. In force

The application was abandoned for failure to pay the annuities (art. 86 of the Brazilian IP Act). The technology is in the public domain in Brazil.

Talk to a specialist

Latest action published by the INPI: 10/02/2012. We update with every new RPI gazette, published weekly.

Applicants and inventors

Applicants

J. F. (pessoa física)

SP, BR

Inventors

J. F. (pessoa física)

BR

Technical data

IPC Classification

Abstract

DISPOSIÇÃO CONSTRUTIVA INTRODUZIDA EM CRUZETA APLICADA A LINHA DE TRANSMISSÃO E DISTRIBUIÇÃO DE ENERGIA ELETRICA, constituída por um perfil estrutural tubular (1) fabricado em plástico reforçado com fibras de vidro ou fibras naturais ou fibras orgânicas ou qualquer outra origem, com enchimento polimérico (2) e tubos internos (3), também em plástico reforçado com fibras ou outro material, colocados em todas as furações (4) e tampas (5) para fechamento das extremidades no mesmo material.

Prosecution history

Publications in the Brazilian Industrial Property Gazette (RPI).

Arquivamento definitivo por descumprimento

#8.11

Referente ao despacho 8.6 publicado na RPI 2156 de 02/05/2012.

10/02/2012

RPI 2178

Arquivamento por falta de pagamento

#8.6

Referente à 3ª anuidade.

05/02/2012

RPI 2156

Publicação do pedido de patente

#3.1

10/19/2010

RPI 2076

Pedido de patente depositado

#2.1

06/23/2009

RPI 2007

Patent monitoring

Track this patent in real time.

Receive alerts on INPI events, decisions, and expiry dates for your portfolio.