Concessão da patente
#16.1
20 (vinte) anos contados a partir de 02/08/2010, observadas as condições legais
01/14/2020
RPI 2558
Application data
Number
112013002727Type
Filing
Publication
PCT
EP2010061233 The patent was granted on 01/14/2020 and is in force until 08/02/2030. Until then, no one may make, use or sell the invention in Brazil without the owner's authorisation.
Protection valid until:08/02/2030
Latest action published by the INPI: 01/14/2020. We update with every new RPI gazette, published weekly.
Applicants
ALSTOM HYDRO ESPAÑA, S.L.
ES
ALSTOM RENEWABLES ESPAÑA, S.L.
ES
ALSTOM RENEWABLE SPAIN, S.L.
ES
A. S. (pessoa física)
ES
GENERAL ELECTRIC RENOVABLES ESPAÑA, S.L.
ES
G. T. (pessoa física)
FR
GE RENEWABLE TECHNOLOGIES WIND B.V.
NL
Inventors
J. P. (pessoa física)
ES
M. D. (pessoa física)
ES
O. B. (pessoa física)
ES
Abstract
MÉTODO DE REGULAÇÃO DE POTÊNCIA REATIVA EM UM PARQUE EÓLICO E EM UMA TURBINA EÓLICA, E PARQUE EÓLICO. A presente invenção refere-se a um método de regulação de potência reativa em uma turbina eólica (100,200,n00), que compreende, pelo menos, um sistema local de controle de potência reativa (120,220,n20,x20) adaptado para operar em um modo de controle central e um modo de controle local, um método de regulação de potência reativa em um parque eólico conectado a uma rede elétrica (10) e a um parque eólico.
Publications in the Brazilian Industrial Property Gazette (RPI).
#16.1
20 (vinte) anos contados a partir de 02/08/2010, observadas as condições legais
01/14/2020
RPI 2558
#9.1
11/12/2019
RPI 2549
#7.1
07/02/2019
RPI 2530
03/12/2019
RPI 2514
#6.6.1
01/15/2019
RPI 2506
#25.1
07/03/2018
RPI 2478
#25.1
06/12/2018
RPI 2475
#25.4
05/22/2018
RPI 2472
#25.4
08/08/2017
RPI 2431
#25.1
07/25/2017
RPI 2429
#25.1
07/11/2017
RPI 2427
#1.3
05/31/2016
RPI 2369
#1.1
12/31/2013
RPI 2243
From the same holder
Same category
Patent monitoring
Receive alerts on INPI events, decisions, and expiry dates for your portfolio.